Concrete Volume of Footings, Columns, Beams and Slabs

Concrete volume of a set of rectangular footings, columns, beams and a slab from their sizes and numbers, with the total and the volume ordered with wastage.

Inputs

Examples: Small frame: 12 footings, 12 columns, slab 180 m²Pump house: 6 footings, slab 60 m²Slab only

Footings

Columns

Beams

Slab

Results

Beam depth below the slab avoids counting the slab twice; column height between the footing top and the beam soffit likewise. Measure beam lengths as clear spans between columns: centre-to-centre lengths count the beam–column joints twice.

Footings5.4000m³
Columns2.4300m³
Beams2.7600m³
Slab7.2000m³
Total17.790m³
Volume to order (with wastage)18.680m³

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Small frame: 12 footings, 12 columns, slab 180 m². The inputs, in the units selected above:

InputValue
Footing length1.8000 m
Footing width1.8000 m
Footing depth0.45000 m
Number of footings12.000 -
Column width0.30000 m
Column depth0.45000 m
Column height3.6000 m
Number of columns12.000 -
Beam width0.23000 m
Beam depth below the slab0.33000 m
Total length of beams96.000 m
Slab area180.00 m²
Slab thickness0.15000 m
Wastage allowance3.0000 %

Applying the formula below gives:

ResultValue
Footings17.496 m³
Columns5.8320 m³
Beams7.2864 m³
Slab27.000 m³
Total57.614 m³
Volume to order (with wastage)59.343 m³

Open this example in the calculator and change any input.

Formula

\(V = \sum n\, L B D + \sum n\, b d h + b_b d_b L_b + A_s t_s, \quad V_o = V(1 + k_w)\)

Variables

Symbol Meaning SI unit
\(L_f\) Footing length m
\(B_f\) Footing width m
\(D_f\) Footing depth m
\(n_f\) Number of footings -
\(b_c\) Column width m
\(d_c\) Column depth m
\(h_c\) Column height m
\(n_c\) Number of columns -
\(b_b\) Beam width m
\(d_b\) Beam depth below the slab m
\(L_b\) Total length of beams m
\(A_s\) Slab area m²
\(t_s\) Slab thickness m
\(k_w\) Wastage allowance -
\(V_f\) Footings m³
\(V_c\) Columns m³
\(V_b\) Beams m³
\(V_s\) Slab m³
\(V\) Total m³
\(V_o\) Volume to order (with wastage) m³

Method and standards

Volumes of prisms.

Where it is used

  • Estimating and ordering concrete.
  • Checking bills of quantities.

Common mistakes

  • Double counting beams and slab.
  • Forgetting pedestals and plinth beams.

Assumptions and limits

  • Rectangular members.
  • Column height from the footing top to the beam soffit; beam lengths as clear spans between columns. Centre-to-centre beam lengths count each beam–column joint (b_b × d_b × column width) twice.

References

  • Volume of rectangular members (Common site practice (quantity estimating))

Questions and answers

What do the defaults add up to?

Footings 17.50, columns 5.83, beams 7.29, slab 27.0 m³: about 57.6 m³.

Why measure beams below the slab?

The slab already includes the part of the beam within its thickness.

How much wastage?

Your site figure; 2–5 % is typical for ready-mixed concrete.

Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.