FireCADCalc

Air Separator Circulating Load and Efficiency

Circulating load, separator feed and tailings rates and recovery of fines from the fineness of separator feed, tailings and fines in a closed-circuit mill.

Inputs

Examples: Duda Example 15.1: 65 / 55 / 95 % passing, 15 t/h finesFinish mill, 45 µm passing 70 / 55 / 92 %Raw mill separator

Results

Use the same sieve (or fineness measure) for all three samples taken at the same time. With residues instead of passing, enter 100 % minus the residue. Recovery is the two-product formula applied to the fines.

Circulating load (tailings / fines)300.00%
Tailings rate45.000t/h
Separator feed rate60.000t/h
Recovery of fines in the feed to the product36.538%

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Duda Example 15.1: 65 / 55 / 95 % passing, 15 t/h fines. The inputs, in the units selected above:

InputValue
Separator feed passing the test sieve65.000 %
Tailings (rejects) passing the sieve55.000 %
Fines (product) passing the sieve95.000 %
Fines (product) rate15.000 t/h

Applying the formula below gives:

ResultValue
Circulating load (tailings / fines)300.00 %
Tailings rate45.000 t/h
Separator feed rate60.000 t/h
Recovery of fines in the feed to the product36.538 %

Open this example in the calculator and change any input.

Formula

\(L = \frac{C - A}{A - B}, \quad G = L D, \quad F = (L + 1)D, \quad E = \frac{C(A - B)}{A(C - B)}\)

Variables

Symbol Meaning SI unit
\(A\) Separator feed passing the test sieve -
\(B\) Tailings (rejects) passing the sieve -
\(C\) Fines (product) passing the sieve -
\(D\) Fines (product) rate kg/s
\(L\) Circulating load (tailings / fines) -
\(G\) Tailings rate kg/s
\(F\) Separator feed rate kg/s
\(E\) Recovery of fines in the feed to the product -

Method and standards

Two-product balance on the separator.

Where it is used

  • Closed-circuit cement and raw mill audits.
  • Separator tuning.

Common mistakes

  • Mixing passing and residue data.
  • Sampling at different times.

Assumptions and limits

  • Steady state.

References

  • Duda
  • Cement Data Book
  • Vol. 1
  • 3rd ed. (Bauverlag / Macdonald and Evans, 1985)
  • sec. 15.8 (air separator formulas) and Examples 15.1-15.2

Questions and answers

Why is the circulating load so high in cement mills?

Returning coarse rejects lets the mill grind for a short time per pass, avoiding overgrinding; 150–300 % is common.

Can I use Blaine instead of sieve passing?

Only sieve-type measures add linearly; Blaine surface does not mix linearly and gives errors.

What do the defaults represent?

Duda's Example 15.1: 65, 55 and 95 % passing 200 mesh in feed, tailings and fines, 15 t/h fines (300 %, 45 t/h tailings, 60 t/h feed).

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.