FireCADCalc

Trash Rack Head Loss (Kirschmer)

Head loss through an intake trash rack by Kirschmer's formula from bar shape, thickness, spacing, velocity and inclination, with clogging and power lost.

Thermal power plant

Inputs

Examples: Illustrative flat bars 12 / 60 mmRound-nosed bars, fish-friendly 0.6 m/sCoarse rack, vertical, clean

Accepted: 0.5 to 3
Accepted: 2 to 50 mm
Accepted: 5 to 300 mm
Accepted: 0.1 to 3 m/s
Accepted: 17.189 to 90 °
Accepted: 1 to 5
Accepted: 36 to 3,600,000 m³/h
Accepted: 50 to 100 %

Results

Kirschmer: h = k_t(t/b)^(4/3)(v²/2g)sinθ, with k_t about 2.42 for square-edged flat bars, 1.83 for round-nosed and 0.76–1.0 for streamlined bars. Debris raises losses sharply; racks are cleaned (raked) when the differential level rises. Keep approach velocity below about 1 m/s to limit losses and help fish.

Clean rack head loss13.940mm
Head loss with clogging20.909mm
Power lost (clogged)5.4133kW

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Illustrative flat bars 12 / 60 mm. The inputs, in the units selected above:

InputValue
Bar shape factor (2.42 square-nosed flat bars)2.4200 -
Bar thickness12.000 mm
Clear spacing between bars60.000 mm
Approach velocity1.0000 m/s
Rack inclination from horizontal75.000 °
Clogging multiplier1.5000 -
Flow108,000 m³/h
Plant efficiency88.000 %

Applying the formula below gives:

ResultValue
Clean rack head loss13.940 mm
Head loss with clogging20.909 mm
Power lost (clogged)5.4133 kW

Open this example in the calculator and change any input.

Formula

\(h_r = k_t\left(\frac tb\right)^{4/3}\frac{v^2}{2g}\sin\theta\)

Variables

Symbol Meaning SI unit
\(k_t\) Bar shape factor (2.42 square-nosed flat bars) -
\(t\) Bar thickness m
\(b\) Clear spacing between bars m
\(v\) Approach velocity m/s
\(\theta\) Rack inclination from horizontal rad
\(f_c\) Clogging multiplier -
\(Q\) Flow m³/s
\(\eta\) Plant efficiency -
\(h_r\) Clean rack head loss m
\(h_{r,c}\) Head loss with clogging m
\(P_{loss}\) Power lost (clogged) W

Method and standards

Rack loss.

Where it is used

  • Hydro intake and pump intake design.
  • Raking schedule and differential level alarms.

Common mistakes

  • Using gross area velocity instead of approach velocity.
  • Ignoring clogging in net head.

Assumptions and limits

  • Bars normal to the flow; uniform approach.

References

  • Kirschmer trash rack formula

Questions and answers

Why does clogging matter so much?

Debris blocks open area, raising velocity and loss; racks can lose several times their clean loss within hours in floods.

What approach velocity is used?

About 0.6–1.0 m/s, lower where fish protection matters.

What do the defaults represent?

An illustrative rack of 12 mm flat bars at 60 mm spacing, 1 m/s approach, 75° inclination, 50 % clogging allowance, 30 m³/s flow.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Gulliver and Arndt, Hydropower Engineering Handbook (McGraw-Hill, 1991)

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.