Worked example
Example: 4 million m3, 300 m, 3 % loss, 90/88 %, 250 MW. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Live storage volume | 4,000,000 m³ |
| Gross head | 300.00 m |
| Conduit head loss as a share of gross head (each direction) | 3.0000 % |
| Turbine-generator efficiency | 90.000 % |
| Pump-motor efficiency | 88.000 % |
| Rated generating power | 250.00 MW |
| Water density | 1,000.0 kg/m³ |
Applying the formula below gives:
| Result | Value |
|---|---|
| Energy generated | 2,853.7 MWh |
| Energy needed for pumping | 3,826.1 MWh |
| Round-trip efficiency | 74.586 % |
| Generating hours at rated power | 11.415 h |
| Flow at rated power | 97.338 m³/s |
| Energy density of the water | 2.5684 kJ/kg |
Open this example in the calculator and change any input.
Formula
\(E_g = \rho gVH(1 - h_L/H)\eta_{tg}, \quad E_p = \frac{\rho gVH(1 + h_L/H)}{\eta_{pm}}, \quad \eta_{rt} = \frac{E_g}{E_p}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(V\) | Live storage volume | m³ |
| \(H\) | Gross head | m |
| \(h_L/H\) | Conduit head loss as a share of gross head (each direction) | - |
| \(\eta_{tg}\) | Turbine-generator efficiency | - |
| \(\eta_{pm}\) | Pump-motor efficiency | - |
| \(P\) | Rated generating power | W |
| \(\rho\) | Water density | kg/m³ |
| \(E_g\) | Energy generated | J |
| \(E_p\) | Energy needed for pumping | J |
| \(\eta_{rt}\) | Round-trip efficiency | - |
| \(t_g\) | Generating hours at rated power | s |
| \(Q_g\) | Flow at rated power | m³/s |
| \(e\) | Energy density of the water | J/kg |
Method and standards
Potential-energy balance of a two-reservoir pumped storage scheme.
Where it is used
- Sizing reservoirs for daily or weekly storage.
- Comparing pumped hydro with batteries.
Common mistakes
- Using the same head for pumping and generating.
- Forgetting the conduit losses.
Assumptions and limits
- Average head; constant efficiencies.
Questions and answers
Why is the round trip below the product of the machine efficiencies?
Conduit losses work against you twice: the turbine sees less than the gross head and the pump must deliver more.
What do the defaults represent?
An illustrative case: 4 million m3, 300 m, 3 % loss, 90/88 %, 250 MW. Replace the inputs with your own data.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Nag, Power Plant Engineering, 3rd ed. (Tata McGraw-Hill, 2008), ch. 12 (energy storage: pumped hydro)