FireCADCalc

Pumped Storage: Energy, Generating Hours and Round-trip Efficiency

Energy generated and energy needed for pumping from reservoir volume and head, generating hours and flow at rated power, and the round-trip cycle efficiency.

Thermal power plant

Inputs

Examples: 4 million m3, 300 m, 3 % loss, 90/88 %, 250 MWSmall 0.5 million m3, 120 m, 5 %, 85/85 %, 30 MWHigh head 10 million m3, 700 m, 2 %, 91/90 %, 1,000 MW

Accepted: 1,000 to 1E+10 m³
Accepted: 10 to 2,000 m
Accepted: 0 to 20 %
Accepted: 50 to 100 %
Accepted: 50 to 100 %
Accepted: 0.001 to 10,000 MW
Accepted: 990 to 1,030 kg/m³

Results

Reservoir level changes are averaged into the gross head. Typical modern plants achieve 75–80 % round-trip efficiency.

Energy generated2,853.7MWh
Energy needed for pumping3,826.1MWh
Round-trip efficiency74.586%
Generating hours at rated power11.415h
Flow at rated power97.338m³/s
Energy density of the water2.5684kJ/kg

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 4 million m3, 300 m, 3 % loss, 90/88 %, 250 MW. The inputs, in the units selected above:

InputValue
Live storage volume4,000,000 m³
Gross head300.00 m
Conduit head loss as a share of gross head (each direction)3.0000 %
Turbine-generator efficiency90.000 %
Pump-motor efficiency88.000 %
Rated generating power250.00 MW
Water density1,000.0 kg/m³

Applying the formula below gives:

ResultValue
Energy generated2,853.7 MWh
Energy needed for pumping3,826.1 MWh
Round-trip efficiency74.586 %
Generating hours at rated power11.415 h
Flow at rated power97.338 m³/s
Energy density of the water2.5684 kJ/kg

Open this example in the calculator and change any input.

Formula

\(E_g = \rho gVH(1 - h_L/H)\eta_{tg}, \quad E_p = \frac{\rho gVH(1 + h_L/H)}{\eta_{pm}}, \quad \eta_{rt} = \frac{E_g}{E_p}\)

Variables

Symbol Meaning SI unit
\(V\) Live storage volume m³
\(H\) Gross head m
\(h_L/H\) Conduit head loss as a share of gross head (each direction) -
\(\eta_{tg}\) Turbine-generator efficiency -
\(\eta_{pm}\) Pump-motor efficiency -
\(P\) Rated generating power W
\(\rho\) Water density kg/m³
\(E_g\) Energy generated J
\(E_p\) Energy needed for pumping J
\(\eta_{rt}\) Round-trip efficiency -
\(t_g\) Generating hours at rated power s
\(Q_g\) Flow at rated power m³/s
\(e\) Energy density of the water J/kg

Method and standards

Potential-energy balance of a two-reservoir pumped storage scheme.

Where it is used

  • Sizing reservoirs for daily or weekly storage.
  • Comparing pumped hydro with batteries.

Common mistakes

  • Using the same head for pumping and generating.
  • Forgetting the conduit losses.

Assumptions and limits

  • Average head; constant efficiencies.

Questions and answers

Why is the round trip below the product of the machine efficiencies?

Conduit losses work against you twice: the turbine sees less than the gross head and the pump must deliver more.

What do the defaults represent?

An illustrative case: 4 million m3, 300 m, 3 % loss, 90/88 %, 250 MW. Replace the inputs with your own data.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Nag, Power Plant Engineering, 3rd ed. (Tata McGraw-Hill, 2008), ch. 12 (energy storage: pumped hydro)

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.