Worked example
Example: Illustrative flat bars 12 / 60 mm. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Bar shape factor (2.42 square-nosed flat bars) | 2.4200 - |
| Bar thickness | 12.000 mm |
| Clear spacing between bars | 60.000 mm |
| Approach velocity | 1.0000 m/s |
| Rack inclination from horizontal | 75.000 ° |
| Clogging multiplier | 1.5000 - |
| Flow | 108,000 m³/h |
| Plant efficiency | 88.000 % |
Applying the formula below gives:
| Result | Value |
|---|---|
| Clean rack head loss | 13.940 mm |
| Head loss with clogging | 20.909 mm |
| Power lost (clogged) | 5.4133 kW |
Open this example in the calculator and change any input.
Formula
\(h_r = k_t\left(\frac tb\right)^{4/3}\frac{v^2}{2g}\sin\theta\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(k_t\) | Bar shape factor (2.42 square-nosed flat bars) | - |
| \(t\) | Bar thickness | m |
| \(b\) | Clear spacing between bars | m |
| \(v\) | Approach velocity | m/s |
| \(\theta\) | Rack inclination from horizontal | rad |
| \(f_c\) | Clogging multiplier | - |
| \(Q\) | Flow | m³/s |
| \(\eta\) | Plant efficiency | - |
| \(h_r\) | Clean rack head loss | m |
| \(h_{r,c}\) | Head loss with clogging | m |
| \(P_{loss}\) | Power lost (clogged) | W |
Method and standards
Rack loss.
Where it is used
- Hydro intake and pump intake design.
- Raking schedule and differential level alarms.
Common mistakes
- Using gross area velocity instead of approach velocity.
- Ignoring clogging in net head.
Assumptions and limits
- Bars normal to the flow; uniform approach.
References
- Kirschmer trash rack formula
Questions and answers
Why does clogging matter so much?
Debris blocks open area, raising velocity and loss; racks can lose several times their clean loss within hours in floods.
What approach velocity is used?
About 0.6–1.0 m/s, lower where fish protection matters.
What do the defaults represent?
An illustrative rack of 12 mm flat bars at 60 mm spacing, 1 m/s approach, 75° inclination, 50 % clogging allowance, 30 m³/s flow.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Gulliver and Arndt, Hydropower Engineering Handbook (McGraw-Hill, 1991)