FireCADCalc

Surge Tank: Thoma Stable Area, Upsurge and Oscillation Period

Thoma's minimum stable area of a simple surge tank, the frictionless upsurge after full load rejection and the mass oscillation period of tunnel and tank.

Thermal power plant

Inputs

Examples: 3 km, 4 m tunnel, 40 m3/s, 6 m friction, 150 m head, 15 m tank8 km, 6 m tunnel, 90 m3/s, 12 m friction, 300 m head, 20 m tankLow head 1 km, 5 m tunnel, 60 m3/s, 1.5 m friction, 40 m head, 12 m tank (unstable)

Accepted: 10 to 50,000 m
Accepted: 0.5 to 20 m
Accepted: 1 to 100 m
Accepted: 360 to 7,200,000 m³/h
Accepted: 0.01 to 100 m
Accepted: 5 to 2,000 m

Results

Thoma's criterion for small oscillations of a simple surge tank with turbines governed to constant power; friction reduces the real upsurge below the frictionless value.

Tunnel velocity3.1831m/s
Tunnel area28.274m²
Surge tank area314.16m²
Thoma minimum stable area32.459m²
Area ratio (1.5 or more recommended)9.6788
Maximum upsurge, frictionless27.274m
Mass oscillation period598.20s

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 3 km, 4 m tunnel, 40 m3/s, 6 m friction, 150 m head, 15 m tank. The inputs, in the units selected above:

InputValue
Headrace tunnel length to the surge tank3,000.0 m
Tunnel diameter4.0000 m
Surge tank diameter15.000 m
Steady flow144,000 m³/h
Tunnel head loss at the steady flow6.0000 m
Net head at the turbines150.00 m

Applying the formula below gives:

ResultValue
Tunnel velocity3.1831 m/s
Tunnel area12.566 m²
Surge tank area176.71 m²
Thoma minimum stable area21.639 m²
Area ratio (1.5 or more recommended)8.1665
Maximum upsurge, frictionless14.846 m
Mass oscillation period412.11 s

Open this example in the calculator and change any input.

Formula

\(A_{th} = \frac{LA_tV_0^2}{2gh_{f0}H_0}\)

\(Z_{max} = V_0\sqrt{\frac{LA_t}{gA_s}}, \quad T = 2\pi\sqrt{\frac{LA_s}{gA_t}}\)

Variables

Symbol Meaning SI unit
\(L\) Headrace tunnel length to the surge tank m
\(D_t\) Tunnel diameter m
\(D_s\) Surge tank diameter m
\(Q_0\) Steady flow m³/s
\(h_{f0}\) Tunnel head loss at the steady flow m
\(H_0\) Net head at the turbines m
\(V_0\) Tunnel velocity m/s
\(A_t\) Tunnel area m²
\(A_s\) Surge tank area m²
\(A_{th}\) Thoma minimum stable area m²
\(A_s/A_{th}\) Area ratio (1.5 or more recommended) -
\(Z_{max}\) Maximum upsurge, frictionless m
\(T\) Mass oscillation period s

Method and standards

Rigid-column mass oscillation of a tunnel and simple surge tank.

Where it is used

  • Preliminary surge tank sizing.
  • Checking stability after changes in head or flow.

Common mistakes

  • Using the penstock instead of the headrace length.
  • Ignoring the minimum downsurge on load acceptance.

Assumptions and limits

  • Simple (unrestricted) tank; small-oscillation Thoma criterion.

Questions and answers

Why must the tank be large enough?

With governed turbines a falling level demands more flow, which lowers the level further; below the Thoma area the mass oscillations grow instead of decaying.

Why use the frictionless upsurge?

It is a safe upper bound for the tank height after full load rejection; detailed design integrates the oscillation with friction.

What do the defaults represent?

A 3 km, 4 m headrace with 40 m³/s, 6 m of friction and 150 m net head, and a 15 m surge tank: about 22 m² Thoma area against 177 m² provided, a frictionless upsurge near 15 m and a period of about 7 minutes.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Nag, Power Plant Engineering, 3rd ed. (Tata McGraw-Hill, 2008), ch. 10, sec. 10.23 (surge tanks); Thoma (1910) stability criterion

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.