Worked example
Example: Illustrative stream, 4 m3/s turbine, 40 m. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Flow exceeded 5 % of the time | 43,200 m³/h |
| Flow exceeded 20 % of the time | 21,600 m³/h |
| Flow exceeded 50 % of the time | 10,800 m³/h |
| Flow exceeded 80 % of the time | 5,400.0 m³/h |
| Flow exceeded 95 % of the time | 2,880.0 m³/h |
| Design (turbine) flow | 14,400 m³/h |
| Minimum turbine flow (fraction of design) | 25.000 % |
| Residual (compensation) flow left in the river | 1,080.0 m³/h |
| Net head | 40.000 m |
| Turbine and generator efficiency | 85.000 % |
Applying the formula below gives:
| Result | Value |
|---|---|
| Rated power at design flow | 1,333.7 kW |
| Annual energy | 7,441.2 MWh |
| Capacity factor | 63.691 % |
| Mean flow used | 9,171.5 m³/h |
| Time at or above design flow | 37.000 % |
Open this example in the calculator and change any input.
Formula
\(E = \eta\rho gH_n\cdot 8760\,h\cdot\frac{1}{100}\int_0^{100}\min\left[\max(Q(p) - Q_{res}, 0), Q_d\right]dp\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(Q_{5}\) | Flow exceeded 5 % of the time | m³/s |
| \(Q_{20}\) | Flow exceeded 20 % of the time | m³/s |
| \(Q_{50}\) | Flow exceeded 50 % of the time | m³/s |
| \(Q_{80}\) | Flow exceeded 80 % of the time | m³/s |
| \(Q_{95}\) | Flow exceeded 95 % of the time | m³/s |
| \(Q_d\) | Design (turbine) flow | m³/s |
| \(f_{min}\) | Minimum turbine flow (fraction of design) | - |
| \(Q_{res}\) | Residual (compensation) flow left in the river | m³/s |
| \(H_n\) | Net head | m |
| \(\eta\) | Turbine and generator efficiency | - |
| \(P_r\) | Rated power at design flow | W |
| \(E\) | Annual energy | J |
| \(CF\) | Capacity factor | - |
| \(\bar Q_{used}\) | Mean flow used | m³/s |
| \(t_{design}\) | Time at or above design flow | - |
Method and standards
Flow duration energy.
Where it is used
- Small hydro feasibility.
- Choosing turbine size.
Common mistakes
- Using the mean flow without the duration curve.
- Forgetting the residual flow.
Assumptions and limits
- Constant efficiency; piecewise-linear flow duration curve.
References
- Flow-duration method for run-of-river hydro
Questions and answers
How is the design flow chosen?
Often near the flow exceeded 20–40 % of the time; a larger turbine catches more flood water but runs part-loaded or idle more of the year.
Why leave a residual flow?
Regulations require a compensation flow to keep the river's ecology alive; it is never available to the turbine.
What do the defaults represent?
An illustrative stream with 12, 6, 3, 1.5 and 0.8 m³/s exceeded 5, 20, 50, 80 and 95 % of the time, a 4 m³/s turbine down to 25 %, 0.3 m³/s residual flow, 40 m head and 85 % efficiency.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Kothari, Singal and Ranjan, Renewable Energy Sources and Emerging Technologies, 2nd ed. (PHI, 2011), Twidell and Weir, Renewable Energy Resources, 2nd ed. (Taylor and Francis, 2006)