FireCADCalc

Levelised Cost of Energy (LCOE) or of Steam

Levelised cost of electricity, steam or heat from capital cost, interest, life, yearly operating and fuel costs and yearly output, by the capital recovery factor.

Inputs

Examples: Cogeneration 50 M capital, 2 M O&M, 15 M fuel, 8 GWh, 10 %, 15 yearsSolar PV 40 M, 0.5 M O&M, no fuel, 7.5 GWh, 9 %, 25 yearsSteam boiler 30 M, 1.5 M O&M, 60 M fuel, 160 000 t steam, 12 %, 20 years

Results

Constant yearly costs and output in today's money; escalating fuel prices or falling output need a year-by-year cash flow.

Capital recovery factor (per year)0.10181
Capital cost per year4,072,250
Total cost per year4,572,250
Levelised cost per unit of output0.60963

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Cogeneration 50 M capital, 2 M O&M, 15 M fuel, 8 GWh, 10 %, 15 years. The inputs, in the units selected above:

InputValue
Capital cost (your currency)5.0000e+07 -
Operation and maintenance per year2,000,000 -
Fuel cost per year1.5000e+07 -
Output per year (kWh of power or heat, or tonnes of steam)8,000,000 -
Interest (discount) rate10.000 %
Life, years15.000 -

Applying the formula below gives:

ResultValue
Capital recovery factor (per year)0.13147
Capital cost per year6,573,689
Total cost per year2.3574e+07
Levelised cost per unit of output2.9467

Open this example in the calculator and change any input.

Formula

\(CRF = \frac{i (1+i)^n}{(1+i)^n - 1}\)

\(C_y = C_0\, CRF + C_{OM} + C_F\)

\(LCOE = C_y / E_y\)

Variables

Symbol Meaning SI unit
\(C_0\) capital cost currency
\(C_{OM}\) O&M per year currency
\(C_F\) fuel per year currency
\(E_y\) output per year unit
\(i\) interest rate -
\(n\) life years
\(CRF\) capital recovery factor 1/year
\(C_0 CRF\) capital cost per year currency
\(C_y\) total cost per year currency
\(LCOE\) levelised cost currency/unit

Method and standards

The capital is turned into an equal yearly payment by the capital recovery factor; adding yearly operating and fuel costs and dividing by yearly output gives the levelised cost.

Where it is used

  • Comparing power, steam or heat options.
  • Pricing internal steam and power.
  • Screening solar, cogeneration and boiler projects.

Common mistakes

  • Mixing nominal and real interest rates.
  • Using nameplate output instead of expected output.
  • Leaving out major overhauls.

Assumptions and limits

  • Constant yearly costs and output.

References

  • Capital recovery factor method

Questions and answers

What is the LCOE of the example cogeneration plant?

About 2.95 per kWh: 50 M capital at 10 % over 15 years is 6.57 M a year, plus 2 M O&M and 15 M fuel, over 8 GWh.

Can I use it for steam?

Yes: enter yearly steam in tonnes as the output and the result is cost per tonne.

What does it leave out?

Price escalation, varying output, taxes and residual value; use a year-by-year cash flow for those.

Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.