FireCADCalc

Battery Charger Current and Rating

Charger current to supply a standing DC load and recharge a battery in a set time, with the DC output power and AC input kVA.

Thermal power plantProcess steam and utilities

Inputs

Examples: Illustrative 110 V, 300 Ah, 10 h220 V substation 600 Ah, 8 h48 V telecom 400 Ah, 12 h

Accepted: 0 to 10,000 A
Accepted: 1 to 100,000 Ah
Accepted: 1 to 277.78 h
Accepted: 1 to 1.5
Accepted: 6 to 1,000 V
Accepted: 50 to 100 %
Accepted: 30 to 100 %

Results

I = I_L + kC/t_r, from a fully discharged battery. Check the battery maker's maximum charge current (often 0.1–0.25C for lead-acid); choose the next standard charger rating above I.

Recharge current86.250A
Charger output current121.25A
DC output power30.009kW
AC input39.228kVA

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Illustrative 110 V, 300 Ah, 10 h. The inputs, in the units selected above:

InputValue
Continuous DC load current20.000 A
Battery capacity300.00 Ah
Recharge time10.000 h
Recharge factor (Ah returned / Ah removed)1.1500 -
Charging voltage123.75 V
Charger efficiency88.000 %
Charger input power factor80.000 %

Applying the formula below gives:

ResultValue
Recharge current34.500 A
Charger output current54.500 A
DC output power6.7444 kW
AC input9.5801 kVA

Open this example in the calculator and change any input.

Formula

\(I = I_L + \frac{kC}{t_r}, \quad S_{ac} = \frac{IV}{\eta\,pf}\)

Variables

Symbol Meaning SI unit
\(I_L\) Continuous DC load current A
\(C\) Battery capacity C
\(t_r\) Recharge time s
\(k\) Recharge factor (Ah returned / Ah removed) -
\(V\) Charging voltage V
\(\eta\) Charger efficiency -
\(pf\) Charger input power factor -
\(I_c\) Recharge current A
\(I\) Charger output current A
\(P_{dc}\) DC output power W
\(S_{ac}\) AC input VA

Method and standards

Charger sizing.

Where it is used

  • Substation and plant DC systems.
  • Telecom and UPS charger selection.

Common mistakes

  • Forgetting the standing load.
  • Exceeding the battery's maximum charge current.

Assumptions and limits

  • Constant-current recharge from full discharge.

References

  • Charger sizing for standing load plus recharge

Questions and answers

Why is the recharge factor above 1?

Charging is not 100 % efficient in ampere-hours: lead-acid needs about 10–20 % more Ah back than was taken out.

What charger size do substations use?

Enough to carry the standing load and recharge the battery in 8–12 hours, often with two chargers for redundancy.

What do the defaults represent?

An illustrative 110 V lead-acid system (55 cells at 2.25 V) with 20 A standing load and a 300 Ah battery recharged in 10 hours.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Pansini, Electrical Distribution Engineering, 3rd ed. (Fairmont, 2007)

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.