Sprinkler Irrigation Application Rate and Set Time

Application rate of a sprinkler system from sprinkler flow and spacing, its comparison with the soil's intake rate, and the set time to apply a net depth.

Inputs

Examples: Illustrative 12 x 12 m sprinklersClay soil, low intakeSandy soil, large guns

Accepted: 0.0036 to 180 m³/h
Accepted: 1 to 100 m
Accepted: 1 to 100 m
Accepted: 0.5 to 200
Accepted: 1 to 300
Accepted: 40 to 100 %

Results

Each sprinkler covers a rectangle of S_l × S_m, so the application rate is its flow over that area (1 m³/h over 144 m² is about 7 mm/h). It must stay below the soil's basic intake rate or water runs off. The gross depth is the net depth over the application efficiency, and the set time is gross depth over rate.

Application rate (mm per hour)15.432
Rate as a share of the intake rate61.728%
Gross depth (mm)76.923
Set time4.9846h

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Illustrative 12 x 12 m sprinklers. The inputs, in the units selected above:

InputValue
Flow per sprinkler1.2000 m³/h
Spacing along the lateral12.000 m
Spacing between laterals12.000 m
Soil basic intake rate (mm per hour)12.000 -
Net depth to apply (mm)40.000 -
Application efficiency75.000 %

Applying the formula below gives:

ResultValue
Application rate (mm per hour)8.3333
Rate as a share of the intake rate69.444 %
Gross depth (mm)53.333
Set time6.4000 h

Open this example in the calculator and change any input.

Formula

\(AR = \frac{q}{S_l S_m}, \quad d_g = \frac{d_n}{\eta_a}, \quad t = \frac{d_g}{AR}\)

Variables

Symbol Meaning SI unit
\(q\) Flow per sprinkler m³/s
\(S_l\) Spacing along the lateral m
\(S_m\) Spacing between laterals m
\(I\) Soil basic intake rate (mm per hour) -
\(d_n\) Net depth to apply (mm) -
\(\eta_a\) Application efficiency -
\(AR\) Application rate (mm per hour) -
\(AR/I\) Rate as a share of the intake rate -
\(d_g\) Gross depth (mm) -
\(t\) Set time s

Method and standards

Sprinkler rate.

Where it is used

  • Sprinkler system design and scheduling.
  • Checking runoff risk.

Common mistakes

  • Comparing with the initial (not basic) intake rate.
  • Forgetting the efficiency.

Assumptions and limits

  • Uniform overlap; steady flow.

Questions and answers

What application rate do 1.2 m³/h sprinklers at 12 × 12 m give?

About 8.3 mm/h.

Why compare with soil intake rate?

Applying water faster than the soil absorbs it causes ponding and runoff.

What do the defaults represent?

Illustrative 1.2 m³/h sprinklers at 12 m × 12 m on a soil taking 12 mm/h, to apply 40 mm net at 75 % efficiency.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Keller and Bliesner, Sprinkle and Trickle Irrigation (Van Nostrand Reinhold, 1990)

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.