FireCADCalc

Duty and Delta of Irrigation Water

Delta (depth of water over the base period) from duty and base period, Δ = 8.64 B/D, with the canal discharge and water volume for an irrigated area.

Inputs

Examples: Illustrative 120-day cropRice, 120 days, duty 900Wheat, 140 days, duty 3000

Accepted: 1 to 366 d
Accepted: 10 to 20,000
Accepted: 0.1 to 1,000,000 ha

Results

Duty is the area one cumec (1 m³/s) can irrigate when run continuously through the base period; delta is the depth of water that gives the crop. One cumec for B days is 86,400B m³ spread over D hectares, so Δ = 8.64B/D metres. Duty is measured at a point and rises toward the field as losses fall; state where it applies. Rice has a high delta (about 1.2 m), wheat about 0.4 m.

Delta576.00mm
Discharge needed at the field2.7778m³/s
Water over the base period2.8800e+07m³

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Illustrative 120-day crop. The inputs, in the units selected above:

InputValue
Base period120.00 d
Duty (hectares per m³/s)1,800.0 -
Area to irrigate5,000.0 ha

Applying the formula below gives:

ResultValue
Delta576.00 mm
Discharge needed at the field2.7778 m³/s
Water over the base period2.8800e+07 m³

Open this example in the calculator and change any input.

Formula

\(\Delta = \frac{8.64\,B}{D}\)

Variables

Symbol Meaning SI unit
\(B\) Base period s
\(D\) Duty (hectares per m³/s) -
\(A\) Area to irrigate m²
\(\Delta\) Delta m
\(Q\) Discharge needed at the field m³/s
\(V\) Water over the base period m³

Method and standards

Duty and delta.

Where it is used

  • Canal irrigation planning.
  • Civil engineering examinations.

Common mistakes

  • Mixing base period and crop period.
  • Forgetting where the duty is measured.

Assumptions and limits

  • Continuous flow over the base period.

References

  • Classical irrigation engineering relations (duty and delta, Bligh and Lane creep, Khosla exit gradient)

Questions and answers

What delta corresponds to a duty of 1,800 ha/cumec over 120 days?

0.576 m.

What discharge does 5,000 ha need?

About 2.78 m³/s at the field.

What do the defaults represent?

An illustrative crop with a 120-day base period and a duty of 1,800 ha per cumec, for 5,000 ha.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.