Worked example
Example: Illustrative 24-nozzle boom. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Spray volume rate (litres per hectare) | 300.00 - |
| Forward speed | 6.0000 km/h |
| Nozzle spacing on the boom (or swath per nozzle) | 500.00 mm |
| Tank volume | 600.00 L |
| Product dose per hectare | 1.5000 - |
| Nozzles on the boom | 24.000 - |
Applying the formula below gives:
| Result | Value |
|---|---|
| Nozzle output needed | 1.5000 L/min |
| Boom output | 36.000 L/min |
| Area per tank | 2.0000 ha |
| Product per tank (same unit as the dose) | 3.0000 |
Open this example in the calculator and change any input.
Formula
\(q = R\,v\,w\ \ \left(\text{L/min} = \frac{R[\text{L/ha}]\,v[\text{km/h}]\,w[\text{m}]}{600}\right), \quad A_t = \frac{V_t}{R}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(R\) | Spray volume rate (litres per hectare) | - |
| \(v\) | Forward speed | m/s |
| \(w\) | Nozzle spacing on the boom (or swath per nozzle) | m |
| \(V_t\) | Tank volume | m³ |
| \(D\) | Product dose per hectare | - |
| \(n\) | Nozzles on the boom | - |
| \(q\) | Nozzle output needed | m³/s |
| \(Q\) | Boom output | m³/s |
| \(A_t\) | Area per tank | m² |
| \(D_t\) | Product per tank (same unit as the dose) | - |
Method and standards
Sprayer calibration.
Where it is used
- Pesticide and liquid fertiliser application.
- Checking worn nozzles.
Common mistakes
- Changing speed without changing pressure or nozzles.
- Using the boom width instead of nozzle spacing.
Assumptions and limits
- Steady speed; uniform nozzles.
References
- Sprayer calibration: q = R v w / 600 (L/min, L/ha, km/h, m)
Questions and answers
What nozzle output gives 300 L/ha at 6 km/h with 50 cm spacing?
1.5 L/min per nozzle.
How much product per tank?
The dose per hectare times the area one tank covers: 600 L at 300 L/ha covers 2 ha.
What do the defaults represent?
An illustrative boom of 24 nozzles 50 cm apart at 6 km/h, 300 L/ha, 600 L tank, 1.5 L of product per hectare.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.