Worked example
Example: Proctor mould. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Mass of wet soil in the mould or hole | 1.9200 kg |
| Volume of the mould or hole | 944.00 mL |
| Water content | 14.000 % |
| Specific gravity of the solids | 2.7000 - |
| Maximum dry density from the Proctor test | 1,900.0 kg/m³ |
Applying the formula below gives:
| Result | Value |
|---|---|
| Bulk density | 2,033.9 kg/m³ |
| Dry density | 1,784.1 kg/m³ |
| Zero-air-voids dry density at this water content | 1,959.4 kg/m³ |
| Relative compaction ρ_d/ρ_{d,max} | 93.901 % |
| Air voids | 8.9437 % |
Open this example in the calculator and change any input.
Formula
\(\rho_d = \frac{m/V}{1 + w}, \quad \rho_{d,zav} = \frac{G_s \rho_w}{1 + w G_s}, \quad RC = \frac{\rho_d}{\rho_{d,max}}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(m\) | Mass of wet soil in the mould or hole | kg |
| \(V\) | Volume of the mould or hole | m³ |
| \(w\) | Water content | - |
| \(G_s\) | Specific gravity of the solids | - |
| \(\rho_{d,max}\) | Maximum dry density from the Proctor test | kg/m³ |
| \(\rho\) | Bulk density | kg/m³ |
| \(\rho_d\) | Dry density | kg/m³ |
| \(\rho_{d,zav}\) | Zero-air-voids dry density at this water content | kg/m³ |
| \(RC\) | Relative compaction ρ_d/ρ_{d,max} | - |
| \(a_c\) | Air voids | - |
Method and standards
Phase relations.
Where it is used
- Fill and embankment quality control.
- Proctor test sheets.
Common mistakes
- Bulk density compared with the maximum dry density.
- Wrong mould volume.
Assumptions and limits
- Water density 1000 kg/m³.
- A dry density above the zero-air-voids value (negative air voids) is flagged as a test or input error.
References
- Dry density and zero-air-voids relation (ASTM D698 / IS 2720 Part 7 calculations)
Questions and answers
1.92 kg in a 944 cm³ mould at 14 % water?
Bulk 2034, dry 1784 kg/m³; zero-air-voids 1959 kg/m³.
What relative compaction is required?
Your specification's figure, often 95 % of the Proctor maximum.
Why the zero-air-voids line?
No compacted point can lie above it.
Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.