Worked example
Example: Illustrative 0.3 /h growth for 8 h. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Growth-associated coefficient (g product per g cells) | 2.2000 - |
| Non-growth coefficient | 0.050000 1/h |
| Specific growth rate | 0.30000 1/h |
| Initial biomass | 0.50000 g/L |
| Initial product | 0 g/L |
| Time | 8.0000 h |
Applying the formula below gives:
| Result | Value |
|---|---|
| Biomass at time t | 5.5116 g/L |
| Growth-associated product | 11.025 g/L |
| Non-growth-associated product | 0.83526 g/L |
| Product at time t | 11.861 g/L |
| Specific production rate | 0.71000 1/h |
Open this example in the calculator and change any input.
Formula
\(\frac{dP}{dt} = \alpha\frac{dX}{dt} + \beta X, \quad P = P_0 + \left(\alpha + \frac{\beta}{\mu}\right)X_0\left(e^{\mu t} - 1\right)\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(\alpha\) | Growth-associated coefficient (g product per g cells) | - |
| \(\beta\) | Non-growth coefficient | 1/s |
| \(\mu\) | Specific growth rate | 1/s |
| \(X_0\) | Initial biomass | kg/m³ |
| \(P_0\) | Initial product | kg/m³ |
| \(t\) | Time | s |
| \(X\) | Biomass at time t | kg/m³ |
| \(P_g\) | Growth-associated product | kg/m³ |
| \(P_n\) | Non-growth-associated product | kg/m³ |
| \(P\) | Product at time t | kg/m³ |
| \(q_p\) | Specific production rate | 1/s |
Method and standards
Product kinetics.
Where it is used
- Fermentation process design.
- Fitting product formation data.
Common mistakes
- Applying exponential growth beyond the end of the exponential phase.
- Mixing per-hour and per-second rates.
Assumptions and limits
- Exponential growth; constant α and β.
References
- Luedeking–Piret kinetics
Questions and answers
How are α and β found?
Plot q_p against μ from batch or chemostat data: the slope is α and the intercept β.
What if growth slows?
Then X is no longer exponential; integrate dP/dt = α dX/dt + βX with the measured X(t).
What do the defaults represent?
An illustrative culture growing at 0.3 /h from 0.5 g/L for 8 h, with α = 2.2 and β = 0.05 /h.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Shuler and Kargi, Bioprocess Engineering: Basic Concepts, 2nd ed. (Prentice Hall, 2002)