Daily Boiler Log: Steam, Feedwater and Fuel

Steam and feedwater from totaliser readings, average steam and fuel rates, steam-to-fuel ratio and the feedwater not leaving as steam, for a shift or day.

Thermal power plantSugar mill and cogenerationPulp and paperBoiler

Inputs

Examples: Day: steam 15 230 to 15 430 t, coal 33 t, feed 16 100 to 16 312 t, 22 hOil boiler: 820 to 940 t, 8.4 t oil, 900 to 1026 t, 24 hBagasse: 5000 to 7400 t, 1100 t, 5300 to 7790 t, 24 h

Steam meter

The reading at which the totaliser returns to zero. Enter it to handle a roll-over during the period.

Feedwater meter

Results

Steam generated2,400.0t
Feedwater supplied2,490.0t
Average steam flow100,000kg/h
Average fuel flow45,833kg/h
Steam per kg of fuel2.1818kg/kg
Feedwater not leaving as steam (blowdown, leaks, meter error)90.000t
Same, share of feedwater3.6145%

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Day: steam 15 230 to 15 430 t, coal 33 t, feed 16 100 to 16 312 t, 22 h. The inputs, in the units selected above:

InputValue
Steam totaliser, start15,230 t
Steam totaliser, end15,430 t
Feedwater totaliser, start16,100 t
Feedwater totaliser, end16,312 t
Steam totaliser roll-over value (0 = none)0 t
Feedwater totaliser roll-over value (0 = none)0 t
Fuel burned33.000 t
Running hours22.000 h

Applying the formula below gives:

ResultValue
Steam generated200.00 t
Feedwater supplied212.00 t
Average steam flow9,090.9 kg/h
Average fuel flow1,500.0 kg/h
Steam per kg of fuel6.0606 kg/kg
Feedwater not leaving as steam (blowdown, leaks, meter error)12.000 t
Same, share of feedwater5.6604 %

Open this example in the calculator and change any input.

Formula

\(S = S_1 - S_0\ (+\,S_{max}\ \text{after a roll-over}) \qquad W = W_1 - W_0\ (+\,W_{max}) \qquad \bar S = \frac{S}{t_r} \qquad \bar F = \frac{F}{t_r} \qquad \frac{S}{F} \qquad d = \frac{W - S}{W}\)

Variables

Symbol Meaning SI unit
\(S_0\) steam totaliser, start kg
\(S_1\) steam totaliser, end kg
\(W_0\) feedwater totaliser, start kg
\(W_1\) feedwater totaliser, end kg
\(S_{max}\), \(W_{max}\) totaliser roll-over values (0 = none) kg
\(F\) fuel burned kg
\(t_r\) running hours s
\(S\) steam generated kg
\(W\) feedwater supplied kg
\(\bar S\) average steam flow kg/s
\(\bar F\) average fuel flow kg/s
\(S/F\) steam per kg of fuel kg/kg
\(W - S\) feedwater not leaving as steam kg
\(d\) same, share of feedwater –

Method and standards

Differences of totaliser readings over the shift or day; averages over the running hours.

Where it is used

  • Shift and daily boiler log sheets.
  • Spotting meter faults and water losses.
  • Feeding monthly efficiency and cost reports.

Common mistakes

  • Forgetting totaliser roll-over.
  • Using calendar hours instead of running hours for averages.
  • Not correcting steam meters for pressure.

Assumptions and limits

  • Meters read at the same times; fuel burned from weighing or stock change.
  • A totaliser that rolled over once during the period is handled when its roll-over value is entered.
  • A warning appears when more than 10 % of the feedwater did not leave as steam.

References

  • Totaliser differences and averages (definitions)

Questions and answers

How do I make a daily boiler report from the meters?

Subtract start from end readings. Steam from 15 230 to 15 430 t is 200 t; feedwater from 16 100 to 16 312 t is 212 t; with 33 t of coal in 22 hours that is 9.1 t/h of steam, 1.5 t/h of coal and 6.06 kg of steam per kg.

Why is feedwater more than steam?

Blowdown, vents, leaks and meter error. Here 12 t, 5.7 % of feedwater; compare it with the blowdown you expect.

What if steam reads more than feedwater?

A meter is wrong, often a steam meter without pressure correction.

Method and article reviewed by FireCAD engineering on 11 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.