FireCADCalc

Boiler Load Factor and Capacity Utilisation

Average load, load factor, capacity utilisation and running share of a boiler from the steam generated in a period, the running hours and the rated capacity.

Thermal power plantSugar mill and cogenerationPulp and paperBoiler

Inputs

Examples: Day: 200 t steam, 10 t/h MCR, ran 22 hMonth: 25 000 t, 50 t/h, 30 days, ran 650 hYear: 300 000 t, 60 t/h, 8760 h, ran 7600 h

Results

Load factor (average load while running ÷ MCR)90.909%
Capacity utilisation over the whole period83.333%
Running share of the period91.667%
Average steam flow while running9,090.9kg/h

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Day: 200 t steam, 10 t/h MCR, ran 22 h. The inputs, in the units selected above:

InputValue
Steam generated in the period200.00 t
Length of the period24.000 h
Rated capacity (MCR)10,000 kg/h
Running hours in the period22.000 h

Applying the formula below gives:

ResultValue
Load factor (average load while running ÷ MCR)90.909 %
Capacity utilisation over the whole period83.333 %
Running share of the period91.667 %
Average steam flow while running9,090.9 kg/h

Open this example in the calculator and change any input.

Formula

\(\bar{\dot m} = \frac{S}{t_r} \qquad LF = \frac{\bar{\dot m}}{\dot m_{MCR}} \qquad CUF = \frac{S}{\dot m_{MCR}\,t_p} \qquad A = \frac{t_r}{t_p}\)

Variables

Symbol Meaning SI unit
\(S\) steam generated in the period kg
\(t_p\) length of the period s
\(\dot m_{MCR}\) rated capacity (maximum continuous rating) kg/s
\(t_r\) running hours s
\(LF\) load factor –
\(CUF\) capacity utilisation –
\(A\) running share of the period –
\(\bar{\dot m}\) average steam flow while running kg/s

Method and standards

Standard plant performance definitions; note that \(CUF = LF \cdot A\).

Where it is used

  • Daily and monthly boiler house reports.
  • Deciding whether a standby boiler or a smaller boiler would serve the load better.
  • Comparing boilers and sites.

Common mistakes

  • Dividing by calendar hours and calling it load factor.
  • Using a steam meter total that includes another boiler's steam.
  • Using the nameplate rating when the boiler is derated.

Assumptions and limits

  • Steam totals and hours from the same period; the rating is the current MCR.
  • \(A\) is the share of the period the boiler ran, not its availability: a boiler that was available but held on standby counts as not running.

References

  • Plant performance definitions (load factor, capacity utilisation, running share)

Questions and answers

How is boiler load factor calculated?

Average load while running divided by the rated capacity. A 10 t/h boiler that made 200 t of steam in 22 running hours averaged 9.09 t/h: a load factor of 90.9 %. Over the whole 24-hour day its capacity utilisation was 83.3 % and it ran 91.7 % of the time.

Load factor or capacity utilisation?

Load factor shows how hard the boiler works when it runs; capacity utilisation also counts the time it stood idle. A low utilisation with a high load factor means too much downtime; the reverse means the boiler is oversized for the load.

Why does it matter?

Efficiency falls at low load, and fixed costs are spread over less steam. Daily and monthly load factors are part of most boiler house reports.

Method and article reviewed by FireCAD engineering on 11 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.