Penstock Head Loss, Net Head and Hydro Power

Velocity, friction factor, penstock head loss, net head and electrical output of a hydro plant from flow, gross head and penstock size, roughness and fittings.

Thermal power plant

Inputs

Examples: Illustrative 2 m3/s, 80 m, 300 m of 0.9 mMicro hydro 0.05 m3/s, 40 m, 150 m HDPE 0.2 mHigh head 1 m3/s, 400 m, 1500 m of 0.6 m

Accepted: 3.6 to 3,600,000 m³/h
Accepted: 1 to 2,000 m
Accepted: 1 to 10,000 m
Accepted: 0.05 to 10 m
Accepted: 0 to 10 mm
Accepted: 0 to 50
Accepted: 0.85 to 56.85 °C
Accepted: 30 to 100 %

Results

Darcy–Weisbach with the Colebrook–White friction factor and minor losses: h_L = (fL/D + ΣK)v²/2g; P = ηρgQH_n. Designers usually keep penstock losses near 5–10 % of gross head; check water hammer and the economic diameter separately. Water properties from IAPWS-IF97.

Penstock velocity1.5915m/s
Reynolds number243,675
Darcy friction factor0.015366
Head loss1.8758m
Net head38.124m
Head loss as a share of gross head4.6895%
Electrical output13.082kW

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Illustrative 2 m3/s, 80 m, 300 m of 0.9 m. The inputs, in the units selected above:

InputValue
Design flow7,200.0 m³/h
Gross head80.000 m
Penstock length300.00 m
Penstock inside diameter0.90000 m
Wall roughness (welded steel about 0.05 mm)0.050000 mm
Sum of minor loss coefficients (intake, bends, valves)2.5000 -
Water temperature15.000 °C
Turbine and generator efficiency85.000 %

Applying the formula below gives:

ResultValue
Penstock velocity3.1438 m/s
Reynolds number2,485,016
Darcy friction factor0.011744
Head loss3.2325 m
Net head76.767 m
Head loss as a share of gross head4.0407 %
Electrical output1,278.7 kW

Open this example in the calculator and change any input.

Formula

\(h_L = \left(f\frac{L}{D} + \Sigma K\right)\frac{v^2}{2g}, \quad H_n = H_g - h_L, \quad P = \eta\rho gQH_n\)

Variables

Symbol Meaning SI unit
\(Q\) Design flow m³/s
\(H_g\) Gross head m
\(L\) Penstock length m
\(D\) Penstock inside diameter m
\(\varepsilon\) Wall roughness (welded steel about 0.05 mm) m
\(\Sigma K\) Sum of minor loss coefficients (intake, bends, valves) -
\(T\) Water temperature K
\(\eta\) Turbine and generator efficiency -
\(v\) Penstock velocity m/s
\(Re\) Reynolds number -
\(f\) Darcy friction factor -
\(h_L\) Head loss m
\(H_n\) Net head m
\(h_L/H_g\) Head loss as a share of gross head -
\(P\) Electrical output W

Method and standards

Penstock hydraulics.

Where it is used

  • Small and micro hydro design.
  • Upgrading old penstocks.

Common mistakes

  • Using gross head for turbine selection.
  • Ignoring minor losses at the intake.

Assumptions and limits

  • Steady full-pipe flow; uniform diameter.

References

  • Darcy–Weisbach with Colebrook–White in a hydro penstock

Questions and answers

How big should a penstock be?

Large enough to keep losses near 5–10 % of the gross head; doubling the diameter cuts friction loss about 32 times, but costs more steel.

Why include minor losses?

Trash rack, intake, bends and valves can add as much loss as a short penstock itself.

What do the defaults represent?

An illustrative 2 m³/s small hydro scheme with 80 m gross head and a 300 m, 0.9 m steel penstock, ΣK 2.5, water at 15 °C and 85 % efficiency.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Kothari, Singal and Ranjan, Renewable Energy Sources and Emerging Technologies, 2nd ed. (PHI, 2011)

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.