Process Capability Cp, Cpk and Expected Defects

Process capability indices Cp, Cpk, Cpu and Cpl from specification limits, mean and standard deviation, with expected ppm out of specification.

Thermal power plantProcess steam and utilitiesRefinery and petrochemicalChemical and fertiliserPulp and paperFood, dairy and textile

Inputs

Examples: 10 ± 0.5, mean 10.1, σ 0.1Centred, σ 0.15

Results

Assumes a stable, normally distributed process; σ should be the within-subgroup estimate. Cpk of 1.33 is a common minimum; 1.67 for critical features.

Potential capability1.1111
Upper capability1.1111
Lower capability1.1111
Actual capability1.1111
Expected out of specification (ppm)858.12

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 10 ± 0.5, mean 10.1, σ 0.1. The inputs, in the units selected above:

InputValue
Upper specification limit10.500 -
Lower specification limit9.5000 -
Process mean10.100 -
Process standard deviation0.10000 -

Applying the formula below gives:

ResultValue
Potential capability1.6667
Upper capability1.3333
Lower capability2.0000
Actual capability1.3333
Expected out of specification (ppm)31.672

Open this example in the calculator and change any input.

Formula

\(C_p = \frac{USL - LSL}{6\sigma}, \quad C_{pk} = \min\left(\frac{USL - \mu}{3\sigma}, \frac{\mu - LSL}{3\sigma}\right)\)

\(ppm = 10^6\left[1 - \Phi(3C_{pu}) + \Phi(-3C_{pl})\right], \quad \Phi(z) = \tfrac12\left[1 + \operatorname{erf}(z/\sqrt2)\right]\)

Variables

Symbol Meaning SI unit
\(USL\) Upper specification limit -
\(LSL\) Lower specification limit -
\(\mu\) Process mean -
\(\sigma\) Process standard deviation -
\(C_p\) Potential capability -
\(C_{pu}\) Upper capability -
\(C_{pl}\) Lower capability -
\(C_{pk}\) Actual capability -
\(ppm\) Expected out of specification (ppm) -

Method and standards

Capability ratios.

Where it is used

  • Machining and fabrication quality.
  • Instrument and process control performance.

Common mistakes

  • Using overall instead of within-subgroup σ.
  • Applying to unstable processes.

Assumptions and limits

  • Normal, stable process.

References

  • Process capability ratios (Montgomery, Introduction to Statistical Quality Control, 7th ed. (Wiley, 2012), ch. 8)

Questions and answers

What is the difference between Cp and Cpk?

Cp compares the spread with the tolerance; Cpk also accounts for how far the mean is off-centre.

What does Cpk = 1 mean?

The nearer limit is 3σ from the mean: about 1,350 ppm out on that side.

What do the defaults represent?

A 10 ± 0.5 dimension made with mean 10.1 and σ = 0.1.

Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.