Worked example
Example: Illustrative 120-day crop. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Base period | 120.00 d |
| Duty (hectares per m³/s) | 1,800.0 - |
| Area to irrigate | 5,000.0 ha |
Applying the formula below gives:
| Result | Value |
|---|---|
| Delta | 576.00 mm |
| Discharge needed at the field | 2.7778 m³/s |
| Water over the base period | 2.8800e+07 m³ |
Open this example in the calculator and change any input.
Formula
\(\Delta = \frac{8.64\,B}{D}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(B\) | Base period | s |
| \(D\) | Duty (hectares per m³/s) | - |
| \(A\) | Area to irrigate | m² |
| \(\Delta\) | Delta | m |
| \(Q\) | Discharge needed at the field | m³/s |
| \(V\) | Water over the base period | m³ |
Method and standards
Duty and delta.
Where it is used
- Canal irrigation planning.
- Civil engineering examinations.
Common mistakes
- Mixing base period and crop period.
- Forgetting where the duty is measured.
Assumptions and limits
- Continuous flow over the base period.
References
- Classical irrigation engineering relations (duty and delta, Bligh and Lane creep, Khosla exit gradient)
Questions and answers
What delta corresponds to a duty of 1,800 ha/cumec over 120 days?
0.576 m.
What discharge does 5,000 ha need?
About 2.78 m³/s at the field.
What do the defaults represent?
An illustrative crop with a 120-day base period and a duty of 1,800 ha per cumec, for 5,000 ha.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.