Example: Illustrative 18000 h, 250 starts. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Fired operating hours | 18,000 - |
| Starts | 250.00 - |
| Equivalent hours per start | 20.000 - |
| Trips from high load | 6.0000 - |
| Equivalent hours per trip | 100.00 - |
| Hours at peak load | 300.00 - |
| Peak-load life factor | 3.0000 - |
| Inspection interval | 24,000 - |
| Fired hours per year | 6,000.0 - |
| Starts per year | 80.000 - |
Applying the formula below gives:
| Result | Value |
|---|---|
| Equivalent operating hours | 24,200 |
| Remaining to inspection | -200.00 |
| Years to inspection at present duty (no trips or peak) | 0 |
| Share of EOH from starts | 20.661 % |
Open this example in the calculator and change any input.
Formula
\(EOH = OH + k_sN_s + k_tN_t + (f_p - 1)h_p\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(OH\) | Fired operating hours | - |
| \(N_s\) | Starts | - |
| \(k_s\) | Equivalent hours per start | - |
| \(N_t\) | Trips from high load | - |
| \(k_t\) | Equivalent hours per trip | - |
| \(h_p\) | Hours at peak load | - |
| \(f_p\) | Peak-load life factor | - |
| \(EOH_i\) | Inspection interval | - |
| \(h_y\) | Fired hours per year | - |
| \(s_y\) | Starts per year | - |
| \(EOH\) | Equivalent operating hours | - |
| \(EOH_{rem}\) | Remaining to inspection | - |
| \(t_{insp}\) | Years to inspection at present duty (no trips or peak) | - |
| \(\frac{k_sN_s}{EOH}\) | Share of EOH from starts | - |
Method and standards
Equivalent hours.
Where it is used
- Outage planning for gas turbines.
- Valuing cycling versus base-load operation.
Common mistakes
- Using factors from a different model.
- Forgetting trips from high load.
Assumptions and limits
- Linear damage accumulation; constant future duty.
References
- Equivalent operating hours concept
Questions and answers
Why do starts count as hours?
Each start and stop drives a thermal cycle that consumes low-cycle fatigue life in hot parts.
Where do the factors come from?
From the gas turbine maker's maintenance rules for that model; the defaults are only illustrative.
What do the defaults represent?
An illustrative unit with 18,000 fired hours, 250 starts (20 h each), 6 trips (100 h each) and 300 peak hours (factor 3), against a 24,000 EOH interval.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Boyce, Gas Turbine Engineering Handbook, 4th ed. (Butterworth-Heinemann, 2012), Kehlhofer, Hannemann, Stirnimann and Rukes, Combined-Cycle Gas and Steam Turbine Power Plants, 3rd ed. (PennWell, 2009)