FireCADCalc

Traffic Signal Optimum Cycle Length and Green Splits (Webster)

Webster's optimum cycle length and effective green times for a fixed-time traffic signal from the critical flow ratio of each phase and the lost time per phase.

Inputs

Examples: Illustrative: three phases 0.30, 0.25, 0.15, 4 s lost eachTwo-phase junction 0.35 and 0.30, 3.5 s lostBusy four-phase junction 0.25, 0.22, 0.15, 0.12, 4 s (long cycle)

Accepted: 0 to 1
Accepted: 0 to 1
Accepted: 0 to 1
Accepted: 0 to 1
Accepted: 0 to 20 s

Results

Webster: C₀ = (1.5L + 5)/(1 − Y), green split in proportion to the critical flow ratios. Cycles are usually kept between about 30 and 120 s.

Number of phases2.0000
Sum of critical flow ratios0.65000
Total lost time per cycle7.0000s
Optimum cycle length44.286s
Effective green, phase 120.077s
Effective green, phase 217.209s
Effective green, phase 30s
Effective green, phase 40s

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Illustrative: three phases 0.30, 0.25, 0.15, 4 s lost each. The inputs, in the units selected above:

InputValue
Critical flow ratio q/s of phase 10.30000 -
Critical flow ratio of phase 20.25000 -
Critical flow ratio of phase 3 (0 if none)0.15000 -
Critical flow ratio of phase 4 (0 if none)0 -
Lost time per phase4.0000 s

Applying the formula below gives:

ResultValue
Number of phases3.0000
Sum of critical flow ratios0.70000
Total lost time per cycle12.000 s
Optimum cycle length76.667 s
Effective green, phase 127.714 s
Effective green, phase 223.095 s
Effective green, phase 313.857 s
Effective green, phase 40 s

Open this example in the calculator and change any input.

Formula

\(C_0 = \frac{1.5L + 5}{1 - Y}, \quad L = \sum l_i, \quad Y = \sum y_i, \quad g_i = (C_0 - L)\frac{y_i}{Y}\)

Variables

Symbol Meaning SI unit
\(y_1\) Critical flow ratio q/s of phase 1 -
\(y_2\) Critical flow ratio of phase 2 -
\(y_3\) Critical flow ratio of phase 3 (0 if none) -
\(y_4\) Critical flow ratio of phase 4 (0 if none) -
\(l\) Lost time per phase s
\(n\) Number of phases -
\(Y\) Sum of critical flow ratios -
\(L\) Total lost time per cycle s
\(C_0\) Optimum cycle length s
\(g_1\) Effective green, phase 1 s
\(g_2\) Effective green, phase 2 s
\(g_3\) Effective green, phase 3 s
\(g_4\) Effective green, phase 4 s

Method and standards

Webster's signal timing method.

Where it is used

  • Fixed-time signal design and retiming.
  • Junction capacity checks.

Common mistakes

  • Adding flow ratios of non-critical lane groups.
  • Using vehicle counts without converting to passenger car units.

Assumptions and limits

  • Fixed-time control, random arrivals, steady demand.

References

  • Webster's optimum cycle and proportional green splits

Questions and answers

What is a critical flow ratio?

The highest ratio of arriving flow to saturation flow among the lane groups that move in a phase; saturation flow is about 1,800–1,900 pcu/h per lane.

Why is the optimum cycle not as short as possible?

Each phase change loses a few seconds; very short cycles waste a large share of time, while very long ones make vehicles wait; Webster's cycle minimises total delay.

What do the defaults represent?

An illustrative three-phase junction with critical flow ratios 0.30, 0.25 and 0.15 and 4 s of lost time per phase.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Webster, Traffic Signal Settings, Road Research Technical Paper 39 (HMSO, 1958), Garber and Hoel, Traffic and Highway Engineering, 5th ed. (Cengage, 2015), ch. 8

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.