Worked example
Example: Crest +3 % to -2 %. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Incoming grade | 3.0000 % |
| Outgoing grade | -2.0000 % |
| Curve length (horizontal) | 200.00 m |
| Elevation at the start of the curve | 100.00 m |
| Distance from the start | 80.000 m |
Applying the formula below gives:
| Result | Value |
|---|---|
| Algebraic grade difference g₂ − g₁ | -5.0000 % |
| Offset from the incoming tangent (g₂ − g₁) x²/(2L) | -0.80000 m |
| Curve elevation at x | 101.60 m |
| Distance to the high or low point | 120.00 m |
| Elevation of the high or low point | 101.80 m |
Open this example in the calculator and change any input.
Formula
\(z(x) = z_{BVC} + g_1 x + \frac{(g_2 - g_1)x^2}{2L}, \quad x_t = -\frac{g_1 L}{g_2 - g_1}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(g_1\) | Incoming grade | - |
| \(g_2\) | Outgoing grade | - |
| \(L\) | Curve length (horizontal) | m |
| \(z_{BVC}\) | Elevation at the start of the curve | m |
| \(x\) | Distance from the start | m |
| \(A\) | Algebraic grade difference g₂ − g₁ | - |
| \(y\) | Offset from the incoming tangent (g₂ − g₁) x²/(2L) | m |
| \(z(x)\) | Curve elevation at x | m |
| \(x_t\) | Distance to the high or low point | m |
| \(z_t\) | Elevation of the high or low point | m |
Method and standards
Equal-tangent parabola.
Where it is used
- Road and drain profiles.
- Setting out levels.
Common mistakes
- Percent vs fraction in grades.
- Measuring x along the slope.
Assumptions and limits
When both grades have the same sign there is no high or low point inside the curve; x_t and z_t are then left out (the extreme elevations are at the ends).
Horizontal distances, symmetric curve.
References
- Equal-tangent parabolic vertical curve
Questions and answers
+3 % to −2 % over 200 m?
High point 120 m from the start, 1.80 m above it.
Why a parabola?
Grade changes at a constant rate, giving a smooth ride.
Curve length?
Your road standard sets it from sight distance and comfort.
Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.