Worked example
Example: Illustrative: three phases 0.30, 0.25, 0.15, 4 s lost each. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Critical flow ratio q/s of phase 1 | 0.30000 - |
| Critical flow ratio of phase 2 | 0.25000 - |
| Critical flow ratio of phase 3 (0 if none) | 0.15000 - |
| Critical flow ratio of phase 4 (0 if none) | 0 - |
| Lost time per phase | 4.0000 s |
Applying the formula below gives:
| Result | Value |
|---|---|
| Number of phases | 3.0000 |
| Sum of critical flow ratios | 0.70000 |
| Total lost time per cycle | 12.000 s |
| Optimum cycle length | 76.667 s |
| Effective green, phase 1 | 27.714 s |
| Effective green, phase 2 | 23.095 s |
| Effective green, phase 3 | 13.857 s |
| Effective green, phase 4 | 0 s |
Open this example in the calculator and change any input.
Formula
\(C_0 = \frac{1.5L + 5}{1 - Y}, \quad L = \sum l_i, \quad Y = \sum y_i, \quad g_i = (C_0 - L)\frac{y_i}{Y}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(y_1\) | Critical flow ratio q/s of phase 1 | - |
| \(y_2\) | Critical flow ratio of phase 2 | - |
| \(y_3\) | Critical flow ratio of phase 3 (0 if none) | - |
| \(y_4\) | Critical flow ratio of phase 4 (0 if none) | - |
| \(l\) | Lost time per phase | s |
| \(n\) | Number of phases | - |
| \(Y\) | Sum of critical flow ratios | - |
| \(L\) | Total lost time per cycle | s |
| \(C_0\) | Optimum cycle length | s |
| \(g_1\) | Effective green, phase 1 | s |
| \(g_2\) | Effective green, phase 2 | s |
| \(g_3\) | Effective green, phase 3 | s |
| \(g_4\) | Effective green, phase 4 | s |
Method and standards
Webster's signal timing method.
Where it is used
- Fixed-time signal design and retiming.
- Junction capacity checks.
Common mistakes
- Adding flow ratios of non-critical lane groups.
- Using vehicle counts without converting to passenger car units.
Assumptions and limits
- Fixed-time control, random arrivals, steady demand.
References
- Webster's optimum cycle and proportional green splits
Questions and answers
What is a critical flow ratio?
The highest ratio of arriving flow to saturation flow among the lane groups that move in a phase; saturation flow is about 1,800–1,900 pcu/h per lane.
Why is the optimum cycle not as short as possible?
Each phase change loses a few seconds; very short cycles waste a large share of time, while very long ones make vehicles wait; Webster's cycle minimises total delay.
What do the defaults represent?
An illustrative three-phase junction with critical flow ratios 0.30, 0.25 and 0.15 and 4 s of lost time per phase.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Webster, Traffic Signal Settings, Road Research Technical Paper 39 (HMSO, 1958), Garber and Hoel, Traffic and Highway Engineering, 5th ed. (Cengage, 2015), ch. 8