Worked example
Example: Illustrative 2500 CVPD, 5 %, 15 years. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Present commercial vehicles per day (both directions) | 2,500.0 - |
| Years from count to opening | 2.0000 - |
| Annual traffic growth | 5.0000 % |
| Design life (years) | 15.000 - |
| Lane distribution factor | 75.000 % |
| Vehicle damage factor (standard axles per vehicle) | 3.5000 - |
Applying the formula below gives:
| Result | Value |
|---|---|
| Traffic at opening (vehicles per day) | 2,756.2 |
| Growth factor over design life | 21.579 |
| Cumulative standard axles (million) | 56.985 |
Open this example in the calculator and change any input.
Formula
\(N_s = \frac{365A\left[(1 + r)^n - 1\right]}{r}DF, \quad A = P(1 + r)^x\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(P\) | Present commercial vehicles per day (both directions) | - |
| \(x\) | Years from count to opening | - |
| \(r\) | Annual traffic growth | - |
| \(n\) | Design life (years) | - |
| \(D\) | Lane distribution factor | - |
| \(F\) | Vehicle damage factor (standard axles per vehicle) | - |
| \(A\) | Traffic at opening (vehicles per day) | - |
| \(G\) | Growth factor over design life | - |
| \(N_s\) | Cumulative standard axles (million) | - |
Method and standards
Design traffic.
Where it is used
- Flexible and rigid pavement design.
- Plant and port road design.
Common mistakes
- Using total rather than commercial traffic.
- Forgetting lane distribution.
Assumptions and limits
- Constant growth rate and damage factor.
References
- Compound-growth cumulative standard axles
Questions and answers
What is a standard axle?
An 80 kN (8.16 t) single axle with dual wheels; other axles are converted by the fourth-power law.
Why include the construction period?
Traffic keeps growing between the count and the road opening, so design starts from the opening-year traffic.
What do the defaults represent?
An illustrative 2,500 commercial vehicles per day counted two years before opening, 5 % growth, 15-year life, 0.75 lane distribution and VDF 3.5.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Khanna and Justo, Highway Engineering, 10th ed. (Nem Chand, 2015), Huang, Pavement Analysis and Design, 2nd ed. (Pearson, 2004)