Worked example
Example: 140-day season. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Cane crushed | 600,000 t |
| Season duration | 140.00 d |
| Stoppage time | 250.00 h |
| Rated capacity | 5,000.0 t/d |
Applying the formula below gives:
| Result | Value |
|---|---|
| Crush rate on net time | 192.93 t/h |
| Daily crush on net time | 4,630.2 t/d |
| Lost time | 7.4405 % |
| Capacity utilisation (average day / rated) | 85.714 % |
Open this example in the calculator and change any input.
Formula
\(TCH = \frac{C_s}{D - t_s}, \quad LT = \frac{t_s}{D}, \quad CU = \frac{C_s / D}{TCD_r}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(C_s\) | Cane crushed | kg |
| \(D\) | Season duration | s |
| \(t_s\) | Stoppage time | s |
| \(TCD_r\) | Rated capacity | kg/s |
| \(TCH\) | Crush rate on net time | kg/s |
| \(TCD\) | Daily crush on net time | kg/s |
| \(LT\) | Lost time | - |
| \(CU\) | Capacity utilisation (average day / rated) | - |
Method and standards
Definitions.
Where it is used
- Season reports.
- Expansion planning.
Common mistakes
- Calendar days mixed with crushing days.
Assumptions and limits
- Season totals: cane crushed, the season from start to end, and all stoppages in it.
- Capacity utilisation is the average day over the whole season against the rating; above 100 % is flagged.
References
- Definitions on season data
Questions and answers
Why on net time?
It shows how fast the mill crushes when it runs; lost time is reported separately.
Main causes of lost time?
Cane shortage, mechanical, electrical, boiler and process stoppages: track each.
Capacity above 100 %?
Possible when the mill is rated conservatively.
Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.