FireCADCalc

Sugar Season KPIs: Crush Rate, Lost Time and Capacity Use

Crush rate per hour and per day on net time, lost time % and capacity utilisation from cane crushed, season days, stoppage hours and rated capacity.

Sugar mill and cogeneration

Inputs

Examples: 140-day seasonShort season

Results

Crush rate on net time192.93t/h
Daily crush on net time4,630.2t/d
Lost time7.4405%
Capacity utilisation (average day / rated)85.714%

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 140-day season. The inputs, in the units selected above:

InputValue
Cane crushed600,000 t
Season duration140.00 d
Stoppage time250.00 h
Rated capacity5,000.0 t/d

Applying the formula below gives:

ResultValue
Crush rate on net time192.93 t/h
Daily crush on net time4,630.2 t/d
Lost time7.4405 %
Capacity utilisation (average day / rated)85.714 %

Open this example in the calculator and change any input.

Formula

\(TCH = \frac{C_s}{D - t_s}, \quad LT = \frac{t_s}{D}, \quad CU = \frac{C_s / D}{TCD_r}\)

Variables

Symbol Meaning SI unit
\(C_s\) Cane crushed kg
\(D\) Season duration s
\(t_s\) Stoppage time s
\(TCD_r\) Rated capacity kg/s
\(TCH\) Crush rate on net time kg/s
\(TCD\) Daily crush on net time kg/s
\(LT\) Lost time -
\(CU\) Capacity utilisation (average day / rated) -

Method and standards

Definitions.

Where it is used

  • Season reports.
  • Expansion planning.

Common mistakes

  • Calendar days mixed with crushing days.

Assumptions and limits

  • Season totals: cane crushed, the season from start to end, and all stoppages in it.
  • Capacity utilisation is the average day over the whole season against the rating; above 100 % is flagged.

References

  • Definitions on season data

Questions and answers

Why on net time?

It shows how fast the mill crushes when it runs; lost time is reported separately.

Main causes of lost time?

Cane shortage, mechanical, electrical, boiler and process stoppages: track each.

Capacity above 100 %?

Possible when the mill is rated conservatively.

Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.