Shovel, Excavator and Loader Production per Hour

Hourly production in bank cubic metres and tonnes from bucket size, fill factor, swell factor, cycle time, availability, utilisation and propel time.

Inputs

Examples: 40 m3 shovel, 30 s, open pit12 m3 wheel loader, 39 s, coal6 m3 hydraulic excavator, 25 s, quarry

Accepted: 0.1 to 100 m³
Accepted: 30 to 120 %
Accepted: 0.3 to 1
Accepted: 5 to 300 s
Accepted: 10 to 100 %
Accepted: 10 to 100 %
Accepted: 30 to 100 %
Accepted: 500 to 5,000 kg/m³

Results

Correct the cycle time for digging depth and swing angle before entering it. Propel time is 0.75 for strip mines, 0.85 open pits, 0.90 sand and gravel and 0.95 high-face quarries (Atkinson).

Operating efficiency67.500%
Production532.73m³/h
Production by mass692.55t/h
Bank volume per pass8.5500m³

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 40 m3 shovel, 30 s, open pit. The inputs, in the units selected above:

InputValue
Bucket or dipper heaped capacity (loose)40.000 m³
Bucket fill factor85.000 %
Swell factor (bank per loose)0.67000 -
Load cycle time30.000 s
Availability85.000 %
Utilisation80.000 %
Propel time factor (1 for loaders)85.000 %
Bank density2,650.0 kg/m³

Applying the formula below gives:

ResultValue
Operating efficiency68.000 %
Production1,580.0 m³/h
Production by mass4,187.1 t/h
Bank volume per pass22.780 m³

Open this example in the calculator and change any input.

Formula

\(P_l = \frac{3600\,C_b\,SF\,E\,FF\,PT}{T_{cl}}, \quad E = A\times U\)

Variables

Symbol Meaning SI unit
\(C_b\) Bucket or dipper heaped capacity (loose) m³
\(FF\) Bucket fill factor -
\(SF\) Swell factor (bank per loose) -
\(T_{cl}\) Load cycle time s
\(A\) Availability -
\(U\) Utilisation -
\(PT\) Propel time factor (1 for loaders) -
\(BD\) Bank density kg/m³
\(E\) Operating efficiency -
\(P_l\) Production m³/s
\(P_t\) Production by mass kg/s
\(V_{pass}\) Bank volume per pass m³

Method and standards

Loading production equation.

Where it is used

  • Fleet planning and mine scheduling.
  • Comparing loading units.

Common mistakes

  • Mixing loose bucket capacity with bank production.
  • Using the cycle time in minutes with 3,600.

Assumptions and limits

  • Average conditions; truck exchange delays are separate.

Questions and answers

What fill factor should I use?

Designers give 0.95-1.0 for easy digging, 0.85-0.90 medium, 0.80-0.85 medium-hard and 0.75-0.80 for hard, blasted rock.

Why is availability times utilisation the efficiency?

Availability is the share of scheduled time the machine can work; utilisation the share of that time it actually works at full potential.

What do the defaults represent?

A 40 m³ shovel, fill 0.85, swell factor 0.67, 30 s cycle, availability 0.85, utilisation 0.80 and propel factor 0.85: 1,580 BCM/h or 4,187 t/h.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Dougherty and Schissler (eds.), SME Mining Reference Handbook, 2nd ed. (SME, 2020), ch. 12, eqs. 12.14-12.17 and Tables 12.10-12.13 (Atkinson 1992)

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.