FireCADCalc

Powder Factor of a Blast from the Pattern and Charge

Rock broken per hole and per blast from burden, spacing and bench height, and the powder factor by volume and by mass with tonnes broken per kilogram.

Inputs

Examples: 15 x 18 ft pattern, 30 ft bench, 300 lb per hole, 40 holesCoal overburden 25 x 30 ft, 60 ft, 900 lb, 20 holesQuarry 10 x 12 ft, 25 ft, 90 lb, 60 holes

Accepted: 0.98425 to 65.617 ft
Accepted: 0.98425 to 98.425 ft
Accepted: 1.6404 to 196.85 ft
Accepted: 0.022046 to 11,023 lb
Accepted: 1 to 10,000
Accepted: 1,000 to 5,000 kg/m³

Results

The volume uses the bench height, not the hole depth: the subdrill breaks rock below the next bench floor. Surface mines usually quote lb/yd³ or kg/m³; metal mines quote tonnes broken per kilogram.

Rock per hole (bank)300.00yd³
Powder factor by volume1.00000lb/yd³
Powder factor by mass0.22388kg/t
Rock broken per unit of explosive4.4667t/kg
Rock broken by the blast9,174.7m³
Rock mass broken by the blast24,313t
Explosive in the blast5,443.1kg

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 15 x 18 ft pattern, 30 ft bench, 300 lb per hole, 40 holes. The inputs, in the units selected above:

InputValue
Burden15.000 ft
Spacing18.000 ft
Bench height (hole depth less subdrill)30.000 ft
Explosive per hole300.00 lb
Number of holes40.000 -
Rock bank density2,650.0 kg/m³

Applying the formula below gives:

ResultValue
Rock per hole (bank)300.00 yd³
Powder factor by volume1.00000 lb/yd³
Powder factor by mass0.22388 kg/t
Rock broken per unit of explosive4.4667 t/kg
Rock broken by the blast9,174.7 m³
Rock mass broken by the blast24,313 t
Explosive in the blast5,443.1 kg

Open this example in the calculator and change any input.

Formula

\(V = BSH, \quad P_f = \frac{W_e}{V}, \quad P_f' = \frac{W_e}{\rho_rV}\)

Variables

Symbol Meaning SI unit
\(B\) Burden m
\(S\) Spacing m
\(H\) Bench height (hole depth less subdrill) m
\(W_e\) Explosive per hole kg
\(n\) Number of holes -
\(\rho_r\) Rock bank density kg/m³
\(V\) Rock per hole (bank) m³
\(P_f\) Powder factor by volume kg/m³
\(P_f'\) Powder factor by mass kg/kg
\(W_r/W_e\) Rock broken per unit of explosive kg/kg
\(V_{tot}\) Rock broken by the blast m³
\(W_r\) Rock mass broken by the blast kg
\(W_{tot}\) Explosive in the blast kg

Method and standards

Powder factor from the blast geometry.

Where it is used

  • Blast reports and cost control.
  • Comparing blasts and explosive products.

Common mistakes

  • Using hole depth instead of bench height.
  • Mixing bank and loose volumes.

Assumptions and limits

  • Geometric; assumes full breakage to the floor.

Questions and answers

What powder factor is typical?

The table: 0.25-0.40 lb/yd³ for easy, 0.40-0.75 medium, 0.75-1.25 hard and up to 2.5 lb/yd³ for very hard breakage; underground headings need far more because there is only one free face.

Is a lower powder factor always cheaper?

Not always: too little explosive gives oversize and toe that cost more in loading, crushing and secondary breakage.

What do the defaults represent?

A 15 by 18 ft pattern on a 30 ft bench with 300 lb per hole: 300 yd³ per hole, 1.0 lb/yd³ or 0.22 kg/t, about 4.5 t of rock per kilogram; 40 holes break 9,175 m³.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Dougherty and Schissler (eds.), SME Mining Reference Handbook, 2nd ed. (SME, 2020), ch. 11, eqs. 11.41-11.43 and Tables 11.3-11.4

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.