Swell Factor and Bank, Loose and Compacted Volumes

Percent swell and swell factor from bank and loose densities, the loose volume to haul for a bank volume, and the mass moved.

Inputs

Examples: Blasted rock 2.65 to 1.77 t/m3, 1,000 BCMClay 1.9 to 1.5 t/m3, 5,000 BCMSand 1.8 to 1.6 t/m3, 250 BCM

Accepted: 500 to 5,000 kg/m³
Accepted: 300 to 5,000 kg/m³
Accepted: 0.01 to 1E+9 m³

Results

Bank measure (BCM, BCY) is in place; loose measure (LCM, LCY) is in the bucket or truck. Production is usually quoted in bank units, so loose capacities are multiplied by the swell factor.

Swell49.718%
Swell factor (bank per loose)0.66792
Loose volume1,497.2m³
Mass2,650.0t

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Blasted rock 2.65 to 1.77 t/m3, 1,000 BCM. The inputs, in the units selected above:

InputValue
Bank density2,650.0 kg/m³
Loose density1,770.0 kg/m³
Bank volume1,000.0 m³

Applying the formula below gives:

ResultValue
Swell49.718 %
Swell factor (bank per loose)0.66792
Loose volume1,497.2 m³
Mass2,650.0 t

Open this example in the calculator and change any input.

Formula

\(\text{swell} = \frac{BD}{LD} - 1, \quad SF = \frac{1}{1 + \text{swell}} = \frac{LD}{BD}, \quad V_l = V_b(1 + \text{swell})\)

Variables

Symbol Meaning SI unit
\(BD\) Bank density kg/m³
\(LD\) Loose density kg/m³
\(V_b\) Bank volume m³
\(\text{swell}\) Swell -
\(SF\) Swell factor (bank per loose) -
\(V_l\) Loose volume m³
\(m\) Mass kg

Method and standards

Bank and loose volume relations.

Where it is used

  • Converting bucket and truck capacities to production.
  • Dump and stockpile volumes.

Common mistakes

  • Multiplying by the swell when dividing is meant.
  • Using compacted density for loose.

Assumptions and limits

  • Densities are averages for the material.

Questions and answers

Is the swell factor the same as percent swell?

No: percent swell is how much the volume grows (bank to loose); the swell factor is the ratio of bank to loose volume, 1/(1 + swell).

What swell is typical?

Blasted hard rock swells 50-70 %, clay and earth 25-40 %, sand and gravel 10-15 %.

What do the defaults represent?

Rock of 2,650 kg/m³ in place and 1,770 kg/m³ loose: 49.7 % swell, swell factor 0.668, so 1,000 BCM becomes 1,497 LCM weighing 2,650 t.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Dougherty and Schissler (eds.), SME Mining Reference Handbook, 2nd ed. (SME, 2020), ch. 12, eqs. 12.10-12.13

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.