Worked example
Example: 15 t skip, 600 m, 12 m/s. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Hoisting distance | 600.00 m |
| Maximum rope speed | 12.000 m/s |
| Acceleration | 0.75000 m/s² |
| Retardation | 0.75000 m/s² |
| Load and dump time | 20.000 s |
| Skip payload | 15.000 t |
| Rope mass per metre (all ropes) | 10.500 kg/m |
| Rope breaking strength (all ropes) | 2,000.0 kN |
| Operating efficiency (about 0.7) | 70.000 % |
| Drive efficiency (about 0.85) | 85.000 % |
| Hoisting hours per day | 20.000 h |
Applying the formula below gives:
| Result | Value |
|---|---|
| Cycle time | 86.000 s |
| Empty skip mass (estimate) | 8.1800 t |
| Suspended mass at the bottom | 29.480 t |
| Rope safety factor | 6.9180 |
| Hoisting capacity | 439.53 t/h |
| Capacity per day | 8,790.7 t |
| Running power (single skip, unbalanced) | 4,081.4 kW |
Open this example in the calculator and change any input.
Formula
\(TC_H = \frac{H}{V_{max}} + \frac{V_{max}}{2}\left(\frac{1}{ACC} + \frac{1}{RET}\right) + T_{dl}, \quad W_S = 0.5L_h + 680\ \text{kg}\)
\(Q = \frac{L_hE}{TC_H}, \quad PR_h = \frac{TWS\cdot g\cdot V_{max}}{EFF}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(H\) | Hoisting distance | m |
| \(V_{max}\) | Maximum rope speed | m/s |
| \(ACC\) | Acceleration | m/s² |
| \(RET\) | Retardation | m/s² |
| \(T_{dl}\) | Load and dump time | s |
| \(L_h\) | Skip payload | kg |
| \(w_r\) | Rope mass per metre (all ropes) | kg/m |
| \(BS\) | Rope breaking strength (all ropes) | N |
| \(E\) | Operating efficiency (about 0.7) | - |
| \(EFF\) | Drive efficiency (about 0.85) | - |
| \(t_d\) | Hoisting hours per day | s |
| \(TC_H\) | Cycle time | s |
| \(W_S\) | Empty skip mass (estimate) | kg |
| \(TWS\) | Suspended mass at the bottom | kg |
| \(SF\) | Rope safety factor | - |
| \(Q\) | Hoisting capacity | kg/s |
| \(Q_d\) | Capacity per day | kg |
| \(PR_h\) | Running power (single skip, unbalanced) | W |
Method and standards
Hoisting equations (Edwards).
Where it is used
- Shaft hoist planning.
- Checking production against depth.
Common mistakes
- Forgetting the rope weight in deep shafts.
- Taking the running power as the motor rating.
Assumptions and limits
- Trapezoidal speed profile; creep speeds neglected.
Questions and answers
What rope safety factor is required?
Mining regulations set it, typically between 4 and 10 depending on depth and conveyance; check the rule that applies at your mine.
Is the running power the motor size?
No: it is the constant-speed power for an unbalanced single skip. Motor ratings come from the peak and RMS power over the acceleration, full-speed and retardation phases.
What do the defaults represent?
A 15 t skip hoisted 600 m at 12 m/s with 0.75 m/s² acceleration and retardation and 20 s to load and dump: a 86 s cycle and 439 t/h at 70 % efficiency; the skip weighs about 8.2 t, the suspended load is 29.5 t and the running power about 4,080 kW.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Dougherty and Schissler (eds.), SME Mining Reference Handbook, 2nd ed. (SME, 2020), ch. 12, eqs. 12.21 and 12.43-12.45 and Table 12.23 (Edwards 1992)