FireCADCalc

Optimum Heat Exchanger Cleaning Interval

Cleaning interval that minimises the average cost of fouling plus cleaning when the fouling penalty grows linearly, with cleanings per year.

Sugar mill and cogenerationDistillery and ethanolRefinery and petrochemicalChemical and fertiliserPulp and paperFood, dairy and textile

Inputs

Examples: 150 000 per cleaning, 2 days, 4 000/day at 90 daysNo downtime

Results

Linear growth of the penalty suits steadily fouling services; for asymptotic fouling the optimum is longer. Include lost production in the cost per cleaning if the plant must slow down.

Growth of the penalty (currency per day²)16.667
Optimum run time between cleanings48.990d
Average cost at the optimum (currency per day)816.50
Cleanings per year7.4505

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 150 000 per cleaning, 2 days, 4 000/day at 90 days. The inputs, in the units selected above:

InputValue
Cost per cleaning (currency)150,000 -
Downtime per cleaning2.0000 d
Fouling penalty rate at the reference time (currency per day)4,000.0 -
Reference time after cleaning90.000 d

Applying the formula below gives:

ResultValue
Growth of the penalty (currency per day²)44.444
Optimum run time between cleanings80.183 d
Average cost at the optimum (currency per day)3,563.7
Cleanings per year4.4413

Open this example in the calculator and change any input.

Formula

\(\bar C(t) = \frac{C_c + at^2/2}{t + t_d}, \quad t^* = -t_d + \sqrt{t_d^2 + \frac{2C_c}{a}}, \quad a = \frac{L_r}{t_r}\)

Variables

Symbol Meaning SI unit
\(C_c\) Cost per cleaning (currency) -
\(t_d\) Downtime per cleaning s
\(L_r\) Fouling penalty rate at the reference time (currency per day) -
\(t_r\) Reference time after cleaning s
\(a\) Growth of the penalty (currency per day²) -
\(t^*\) Optimum run time between cleanings s
\(\bar C\) Average cost at the optimum (currency per day) -
\(n\) Cleanings per year -

Method and standards

Cost-rate minimisation.

Where it is used

  • Evaporator and juice heater cleaning schedules.
  • Crude preheat and cooling water exchangers.

Common mistakes

  • Leaving out downtime.
  • Using a penalty that has already levelled off.

Assumptions and limits

  • Linear fouling penalty; same cost each cleaning.

References

  • Minimum average cost per unit time with a linearly rising fouling penalty (engineering economics; definitions)

Questions and answers

Why is there an optimum?

Cleaning too often wastes cleaning cost and downtime; too seldom lets the fouling penalty grow. The sum per day has a minimum.

How do I find the penalty rate?

Extra fuel or lost output due to fouling, from the change in U or outlet temperature since the last cleaning.

What do the defaults give?

150,000 per cleaning, 2 days down, penalty reaching 4,000 per day after 90 days: clean about every 80 days.

Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.