Worked example
Example: K2O, 25 % bypass (Duda: 1.25 to 0.68 %). The inputs, in the units selected above:
| Input | Value |
|---|---|
| Volatility of the raw-mix alkali | 60.000 % |
| Volatility of the circulating alkali | 90.000 % |
| Bypass (fraction of kiln gas and alkali not condensed in the preheater) | 25.000 % |
| Alkali in clinker without bypass | 1.2500 % |
Applying the formula below gives:
| Result | Value |
|---|---|
| Circulating alkali (per unit input) | 1.3846 |
| Alkali reduction in clinker | 46.154 % |
| Alkali in clinker with bypass | 0.67308 % |
Open this example in the calculator and change any input.
Formula
\(K - 1 = \frac{\varepsilon_1(1 - V)}{1 - \varepsilon_2(1 - V)}, \quad \Delta A = (K - 1)\frac{V}{1 - V}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(\varepsilon_1\) | Volatility of the raw-mix alkali | - |
| \(\varepsilon_2\) | Volatility of the circulating alkali | - |
| \(V\) | Bypass (fraction of kiln gas and alkali not condensed in the preheater) | - |
| \(A_0\) | Alkali in clinker without bypass | - |
| \(K - 1\) | Circulating alkali (per unit input) | - |
| \(\Delta A\) | Alkali reduction in clinker | - |
| \(A\) | Alkali in clinker with bypass | - |
Method and standards
Weber's alkali balance.
Where it is used
- Low-alkali cement production.
- Sizing bypass systems.
Common mistakes
- Using one factor for K₂O and Na₂O.
- Ignoring the heat lost with the bypass gas.
Assumptions and limits
- Alkali in fuel neglected.
References
- Duda
- Cement Data Book
- Vol. 1
- 3rd ed. (Bauverlag / Macdonald and Evans, 1985)
- sec. 20.6.4 (Weber's method) and Table 20.2
Questions and answers
Why bypass kiln gas?
Volatile alkalis, chloride and sulphur evaporate in the burning zone and recondense in the preheater, building a cycle that causes build-ups and high-alkali clinker.
How large a bypass is needed?
It depends on the volatility; Duda shows 25 % bypass taking K₂O from 1.25 % to 0.68 %. Chloride bypasses of a few per cent are common today.
What do the defaults represent?
Duda's K₂O case: ε₁ 0.60, ε₂ 0.90, 25 % bypass, 1.25 % K₂O without bypass (0.68 % with).
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.