Spring and Neap Tides from M2 and S2 Constituents

Spring and neap tidal ranges or peak currents from the principal lunar (M2) and solar (S2) amplitudes, the spring-neap period and the spring-to-neap power ratio.

Thermal power plant

Inputs

Examples: Illustrative M2 1.6, S2 0.6 m/sWeak solar tideElevation 1.2 m and 0.45 m

Accepted: 0.01 to 10 m/s
Accepted: 0 to 10 m/s
Accepted: 1 to 27.778 h
Accepted: 1 to 27.778 h

Results

The lunar M2 and solar S2 constituents beat: in phase they give spring tides (M2 + S2), out of phase neap tides (M2 − S2), over half the beat period of about 14.77 days. Enter current amplitudes (m/s) or elevation amplitudes (read the unit as m); other constituents (K1, O1, N2) are ignored.

Spring amplitude M2 + S22.7000m/s
Neap amplitude M2 − S21.7000m/s
Spring-to-neap ratio1.5882
Current power ratio (cube)4.0063
Spring-neap period14.765d

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Illustrative M2 1.6, S2 0.6 m/s. The inputs, in the units selected above:

InputValue
M2 amplitude (current or elevation)1.6000 m/s
S2 amplitude0.60000 m/s
M2 period12.421 h
S2 period12.000 h

Applying the formula below gives:

ResultValue
Spring amplitude M2 + S22.2000 m/s
Neap amplitude M2 − S21.0000 m/s
Spring-to-neap ratio2.2000
Current power ratio (cube)10.648
Spring-neap period14.765 d

Open this example in the calculator and change any input.

Formula

\(a_{spring} = a_{M2} + a_{S2}, \quad a_{neap} = a_{M2} - a_{S2}, \quad T_{sn} = \frac{1}{|1/T_{S2} - 1/T_{M2}|}\)

Variables

Symbol Meaning SI unit
\(a_{M2}\) M2 amplitude (current or elevation) m/s
\(a_{S2}\) S2 amplitude m/s
\(T_{M2}\) M2 period s
\(T_{S2}\) S2 period s
\(a_{spring}\) Spring amplitude M2 + S2 m/s
\(a_{neap}\) Neap amplitude M2 − S2 m/s
\(a_{spring}/a_{neap}\) Spring-to-neap ratio -
\(P_{spring}/P_{neap}\) Current power ratio (cube) -
\(T_{sn}\) Spring-neap period s

Method and standards

Tidal constituents.

Where it is used

  • Tidal stream resource screening.
  • Teaching tides.

Common mistakes

  • Ignoring diurnal constituents at mixed-tide sites.
  • Expecting springs exactly at new and full moon (they usually lag by one to three days).

Assumptions and limits

  • Two constituents only.

References

  • Harmonic constituents of the tide

Questions and answers

Why do tides vary over a fortnight?

The Moon's and Sun's tidal pulls go in and out of step every 14.77 days, adding at springs and partly cancelling at neaps.

Why does this matter for tidal power?

Power goes with the cube of current, so a spring-to-neap current ratio of 2 means 8 times more power at springs.

What do the defaults represent?

An illustrative site with an M2 current amplitude of 1.6 m/s and S2 of 0.6 m/s.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Twidell and Weir, Renewable Energy Resources, 2nd ed. (Taylor and Francis, 2006), ch. 13

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.