Worked example
Example: Illustrative 250 C reservoir, 180 and 120 C flashes. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Reservoir temperature (saturated liquid) | 250.00 °C |
| High-pressure separator temperature | 180.00 °C |
| Low-pressure flash temperature | 120.00 °C |
| Condenser temperature | 50.000 °C |
| Total geofluid flow | 360,000 kg/h |
| Dry turbine efficiency | 85.000 % |
| Generator efficiency | 98.000 % |
| Dead-state temperature | 25.000 °C |
Applying the formula below gives:
| Result | Value |
|---|---|
| High-pressure steam flow | 57,645 kg/h |
| Low-pressure flashed steam flow | 35,616 kg/h |
| HP turbine power | 3.7433 MW |
| LP turbine power | 8.1031 MW |
| Total electrical power | 11.609 MW |
| Electrical output per kg of geofluid | 116.09 kJ/kg |
| Utilisation efficiency | 45.086 % |
| LP turbine inlet quality | 95.439 % |
Open this example in the calculator and change any input.
Formula
\(\dot m_{LP} = (1 - x_2)\dot m\frac{h_f(T_1) - h_f(T_2)}{h_{fg}(T_2)}, \quad \dot W_e = \eta_g\left[\dot m_{HP}(h_{g,1} - h_{HP,out}) + (\dot m_{HP} + \dot m_{LP})(h_{mix} - h_{LP,out})\right]\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(T_{res}\) | Reservoir temperature (saturated liquid) | K |
| \(T_1\) | High-pressure separator temperature | K |
| \(T_2\) | Low-pressure flash temperature | K |
| \(T_{cond}\) | Condenser temperature | K |
| \(\dot m\) | Total geofluid flow | kg/s |
| \(\eta_{td}\) | Dry turbine efficiency | - |
| \(\eta_g\) | Generator efficiency | - |
| \(T_0\) | Dead-state temperature | K |
| \(\dot m_{HP}\) | High-pressure steam flow | kg/s |
| \(\dot m_{LP}\) | Low-pressure flashed steam flow | kg/s |
| \(\dot W_{HP}\) | HP turbine power | W |
| \(\dot W_{LP}\) | LP turbine power | W |
| \(\dot W_e\) | Total electrical power | W |
| \(w\) | Electrical output per kg of geofluid | J/kg |
| \(\eta_u\) | Utilisation efficiency | - |
| \(x_{mix}\) | LP turbine inlet quality | - |
Method and standards
Double-flash cycle.
Where it is used
- Plant design and conversion of single-flash plants.
- Comparing flash and binary bottoming options.
Common mistakes
- Forgetting to mix the HP exhaust with the LP steam.
- Ignoring silica saturation in the LP brine.
Assumptions and limits
- Saturated-liquid reservoir; ideal separators; no gases or pipe losses.
References
- Double-flash cycle with Baumann wet-turbine rule
Questions and answers
How much more does a second flash give?
Typically 20–30 % more power from the same wells, at the cost of an LP separator, a dual-admission turbine and more silica risk in the colder brine.
How are the two temperatures chosen?
Roughly equal temperature steps from reservoir to condenser, then refined; the LP flash temperature is often limited by silica scaling.
What do the defaults represent?
An illustrative 250 °C reservoir with flashes at 180 °C and 120 °C, condenser 50 °C, 100 kg/s.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
DiPippo, Geothermal Power Plants: Principles, Applications, Case Studies and Environmental Impact, 4th ed. (Butterworth-Heinemann, 2016), ch. 6