Worked example
Example: Illustrative M2 1.6, S2 0.6 m/s. The inputs, in the units selected above:
| Input | Value |
|---|---|
| M2 amplitude (current or elevation) | 1.6000 m/s |
| S2 amplitude | 0.60000 m/s |
| M2 period | 12.421 h |
| S2 period | 12.000 h |
Applying the formula below gives:
| Result | Value |
|---|---|
| Spring amplitude M2 + S2 | 2.2000 m/s |
| Neap amplitude M2 − S2 | 1.0000 m/s |
| Spring-to-neap ratio | 2.2000 |
| Current power ratio (cube) | 10.648 |
| Spring-neap period | 14.765 d |
Open this example in the calculator and change any input.
Formula
\(a_{spring} = a_{M2} + a_{S2}, \quad a_{neap} = a_{M2} - a_{S2}, \quad T_{sn} = \frac{1}{|1/T_{S2} - 1/T_{M2}|}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(a_{M2}\) | M2 amplitude (current or elevation) | m/s |
| \(a_{S2}\) | S2 amplitude | m/s |
| \(T_{M2}\) | M2 period | s |
| \(T_{S2}\) | S2 period | s |
| \(a_{spring}\) | Spring amplitude M2 + S2 | m/s |
| \(a_{neap}\) | Neap amplitude M2 − S2 | m/s |
| \(a_{spring}/a_{neap}\) | Spring-to-neap ratio | - |
| \(P_{spring}/P_{neap}\) | Current power ratio (cube) | - |
| \(T_{sn}\) | Spring-neap period | s |
Method and standards
Tidal constituents.
Where it is used
- Tidal stream resource screening.
- Teaching tides.
Common mistakes
- Ignoring diurnal constituents at mixed-tide sites.
- Expecting springs exactly at new and full moon (they usually lag by one to three days).
Assumptions and limits
- Two constituents only.
References
- Harmonic constituents of the tide
Questions and answers
Why do tides vary over a fortnight?
The Moon's and Sun's tidal pulls go in and out of step every 14.77 days, adding at springs and partly cancelling at neaps.
Why does this matter for tidal power?
Power goes with the cube of current, so a spring-to-neap current ratio of 2 means 8 times more power at springs.
What do the defaults represent?
An illustrative site with an M2 current amplitude of 1.6 m/s and S2 of 0.6 m/s.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Twidell and Weir, Renewable Energy Resources, 2nd ed. (Taylor and Francis, 2006), ch. 13