FireCADCalc

Scraper Cycle, Fleet Production and Scrapers per Pusher

Scraper load in bank measure, theoretical and corrected cycle time from haul distance and speeds, fleet production and scrapers one pusher dozer can serve.

Inputs

Examples: 24 m3 scrapers, 1.2 km, 4 in fleetElevating 16 m3, 600 m, 3 in fleet, chain loadingPush-pull 33 m3, 2 km, 6 in fleet

Accepted: 1 to 100 m³
Accepted: 0.3 to 1
Accepted: 0.1 to 10 min
Accepted: 0.1 to 10 min
Accepted: 10 to 10,000 m
Accepted: 1.8 to 72 km/h
Accepted: 1.8 to 72 km/h
Accepted: 0 to 30 min
Accepted: 1 to 100
Accepted: 10 to 100 %
Accepted: 0.1 to 10 min
Accepted: 500 to 3,500 kg/m³

Results

Typical load times are 0.4-1.0 min for push-loaded conventional scrapers and 0.6-1.3 min for elevating scrapers; pusher cycles are 0.75-1.8 min back-track and 0.6-1.4 min chain or shuttle loading (Hays). Multiply the pusher cycle by 1.2 for tandem pushers.

Scraper load (bank)25.740m³
Theoretical cycle time9.3286min
Corrected cycle time10.129min
Fleet production (bank)686.16m³/h
Fleet production by mass1,372.3t/h
Scrapers one pusher can serve5.1825

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 24 m3 scrapers, 1.2 km, 4 in fleet. The inputs, in the units selected above:

InputValue
Scraper heaped capacity (loose)24.000 m³
Swell factor (bank per loose)0.80000 -
Load time0.70000 min
Spread time0.60000 min
One-way haul distance1,200.0 m
Average loaded speed20.000 km/h
Average return speed30.000 km/h
Wait and delay time per cycle0.50000 min
Scrapers in the fleet4.0000 -
Operating efficiency83.000 %
Pusher cycle time (no waiting)1.2500 min
Bank density1,900.0 kg/m³

Applying the formula below gives:

ResultValue
Scraper load (bank)19.200 m³
Theoretical cycle time7.3000 min
Corrected cycle time7.8000 min
Fleet production (bank)490.34 m³/h
Fleet production by mass931.64 t/h
Scrapers one pusher can serve5.8400

Open this example in the calculator and change any input.

Formula

\(L_h = C_s\,SF, \quad T_{ch} = T_l + \frac{D}{V_l} + T_{dp} + \frac{D}{V_e}, \quad P_h = \frac{60N_hL_hE}{T_{ch} + T_w + T_d}, \quad N_s = \frac{T_{ch}}{T_{pc}}\)

Variables

Symbol Meaning SI unit
\(C_s\) Scraper heaped capacity (loose) m³
\(SF\) Swell factor (bank per loose) -
\(T_l\) Load time s
\(T_{dp}\) Spread time s
\(D\) One-way haul distance m
\(V_l\) Average loaded speed m/s
\(V_e\) Average return speed m/s
\(T_w + T_d\) Wait and delay time per cycle s
\(N_h\) Scrapers in the fleet -
\(E\) Operating efficiency -
\(T_{pc}\) Pusher cycle time (no waiting) s
\(BD\) Bank density kg/m³
\(L_h\) Scraper load (bank) m³
\(T_{ch}\) Theoretical cycle time s
\(TC_{ch}\) Corrected cycle time s
\(P_h\) Fleet production (bank) m³/s
\(P_t\) Fleet production by mass kg/s
\(N_s\) Scrapers one pusher can serve -

Method and standards

Scraper production method.

Where it is used

  • Earthmoving and overburden stripping estimates.
  • Balancing pushers and scrapers.

Common mistakes

  • Mixing loose and bank volumes.
  • Using maximum instead of average speeds.

Assumptions and limits

  • Average speeds and times; grades enter through the speeds.

Questions and answers

How many pushers do I need?

Divide the number of scrapers by the scrapers one pusher can serve and round up; a fraction left over means scrapers will wait for the pusher.

Why is the theoretical cycle used for the pusher ratio?

The pusher only has to keep pace with the scrapers' working cycle; waiting and delays are already lost time.

What do the defaults represent?

24 m³ scrapers (swell factor 0.8) on a 1.2 km haul at 20 km/h loaded and 30 km/h empty, 0.7 min loading and 0.6 min spreading: a 7.3 min cycle; four scrapers move 490 BCM/h and one pusher serves 5.8 scrapers.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Dougherty and Schissler (eds.), SME Mining Reference Handbook, 2nd ed. (SME, 2020), ch. 12, eqs. 12.18-12.21 and 12.28-12.29, Tables 12.14-12.16 (Hays 1990)

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.