FireCADCalc

Mobile Mine Equipment Hourly Repair, Fuel and Tyre Cost

Hourly repair cost from a repair factor and the depreciable value, fuel use from engine power and load factor, tyre cost per hour and the total.

Inputs

Examples: 1,700 kW haul truckWheel loader 400 kWTrack dozer 300 kW, no tyres

Accepted: 0.05 to 2
Accepted: 0 to 1E+9
Accepted: 1 to 5,000 kW
Accepted: 5 to 100 %
Accepted: 0.036 to 3.6 L/kWh
Accepted: 0 to 1,000
Accepted: 0 to 10,000,000
Accepted: 1 to 277,780 h

Results

Costs are in whatever currency the value and prices are entered. The repair factors run from about 0.2 for electric-drive trucks to 1.6 for elevating scrapers; 0.3 L/kWh (0.06 US gal/hp·h) is the full-load fuel rate. Owning cost, labour and lubricants are not included.

Repair cost per hour270.00
Fuel use255.00L/h
Fuel cost per hour255.00
Tyre cost per hour48.000
Repair, fuel and tyre cost per hour573.00

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 1,700 kW haul truck. The inputs, in the units selected above:

InputValue
Repair factor0.60000 -
Depreciable value of the machine (excluding tyres)4,500,000 -
Engine brake power1,700.0 kW
Engine load factor50.000 %
Fuel use per kWh at full load0.30000 L/kWh
Fuel price per litre1.0000 -
Cost of a set of tyres240,000 -
Tyre life5,000.0 h

Applying the formula below gives:

ResultValue
Repair cost per hour270.00
Fuel use255.00 L/h
Fuel cost per hour255.00
Tyre cost per hour48.000
Repair, fuel and tyre cost per hour573.00

Open this example in the calculator and change any input.

Formula

\(R_c = \frac{F_rV_d}{10{,}000}, \quad C_f = EBP\cdot F_l\cdot SFC, \quad \text{tyres} = \frac{C_t}{t_t}\)

Variables

Symbol Meaning SI unit
\(F_r\) Repair factor -
\(V_d\) Depreciable value of the machine (excluding tyres) -
\(EBP\) Engine brake power W
\(F_l\) Engine load factor -
\(\text{SFC}\) Fuel use per kWh at full load m³/J
\(p_f\) Fuel price per litre -
\(C_t\) Cost of a set of tyres -
\(t_t\) Tyre life s
\(R_c\) Repair cost per hour -
\(C_f\) Fuel use m³/s
\(\text{fuel}\) Fuel cost per hour -
\(\text{tyres}\) Tyre cost per hour -
\(\text{total}\) Repair, fuel and tyre cost per hour -

Method and standards

Hourly operating cost estimates.

Where it is used

  • Cost per tonne for mine plans.
  • Comparing equipment options.

Common mistakes

  • Including tyre cost in the depreciable value.
  • Using full-load fuel without the load factor.

Assumptions and limits

  • Order-of-magnitude estimates; use site records when available.

Questions and answers

What is the repair factor?

The repair and maintenance cost over a 10,000-hour reference life as a fraction of the machine's depreciable value; it grows with severity of duty.

What load factor should I use?

Haul trucks average 0.3-0.5, loaders and dozers 0.5-0.7, depending on how often the engine runs near full power.

What do the defaults represent?

A 1,700 kW truck worth 4.5 million with a repair factor of 0.6, 50 % load factor at 0.3 L/kWh and fuel at 1.0 per litre, tyres 240,000 per set lasting 5,000 h: repairs 270, fuel 255 L/h, tyres 48, in all 573 per hour.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Dougherty and Schissler (eds.), SME Mining Reference Handbook, 2nd ed. (SME, 2020), ch. 12, eqs. 12.22-12.23 and Tables 12.4-12.5 (Hays 1990; Atkinson 1992)

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.