Worked example
Example: 10 ft water, 5 in hole, 4 x 16 in cartridges. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Original water height in the hole | 10.000 ft |
| Borehole diameter | 5.0000 in |
| Cartridge diameter | 4.0000 in |
| Cartridge length | 16.000 in |
Applying the formula below gives:
| Result | Value |
|---|---|
| Final water height | 27.778 ft |
| Cartridges to reach the final water height | 20.833 |
| Whole cartridges (rounded up) | 21.000 |
| Rise of the water level | 17.778 ft |
Open this example in the calculator and change any input.
Formula
\(F_H = H_o\frac{D_B^2}{D_B^2 - D_E^2}, \quad N_E = \frac{F_H}{L_E}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(H_o\) | Original water height in the hole | m |
| \(D_B\) | Borehole diameter | m |
| \(D_E\) | Cartridge diameter | m |
| \(L_E\) | Cartridge length | m |
| \(F_H\) | Final water height | m |
| \(N_E\) | Cartridges to reach the final water height | - |
| \(N_E'\) | Whole cartridges (rounded up) | - |
| \(F_H - H_o\) | Rise of the water level | m |
Method and standards
Dyno Nobel water build-out rule.
Where it is used
- Loading wet holes with packaged emulsion before bulk ANFO.
- Estimating cartridges to order.
Common mistakes
- Using the water height before loading as the cartridge column.
Assumptions and limits
- Water is not lost into the rock.
Questions and answers
Why does the water rise?
Each cartridge takes up hole volume, so the same water occupies the thinner annulus round the cartridges and stands higher.
What if the cartridges nearly fill the hole?
The water height grows without limit as the cartridge diameter approaches the hole diameter; pump or dewater the hole instead.
What do the defaults represent?
10 ft of water in a 5 in hole loaded with 4 × 16 in cartridges: the water rises to 27.8 ft, which takes 21 cartridges.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Dougherty and Schissler (eds.), SME Mining Reference Handbook, 2nd ed. (SME, 2020), ch. 11, eqs. 11.44-11.45 (Dyno Nobel 2009)