FireCADCalc

Blast Pattern from a Powder Factor: Burden, Spacing and Charge

Load factor, stemming, subdrill, powder column, charge per hole and the burden and spacing that give a chosen powder factor (rectangular or square pattern).

Inputs

Examples: 6.75 in ANFO hole, 30 ft bench, 1.0 lb/yd3, rectangular9 in emulsion hole, 45 ft bench, 0.8 lb/yd3, square4 in quarry hole, 20 ft bench, 1.2 lb/yd3, rectangular

Accepted: 0.7874 to 19.685 in
Accepted: 0.5 to 1.7
Accepted: 3.2808 to 196.85 ft
Accepted: 0.016856 to 8.4278 lb/yd³

Results

Stemming is 24 hole diameters and subdrill one third of the stemming, in the powder-factor method; the burden and spacing then hold the volume per hole that the powder factor allows. Treat the pattern as a first approximation to be tuned in the field.

Load factor (explosive per length of hole)4.6307lb/ft
Stemming8.0000ft
Subdrill2.6667ft
Powder column14.667ft
Explosive per hole67.917lb
Rock broken per hole56.597yd³
Burden7.1371ft
Spacing10.706ft

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 6.75 in ANFO hole, 30 ft bench, 1.0 lb/yd3, rectangular. The inputs, in the units selected above:

InputValue
Blasthole diameter6.7500 in
Explosive density (specific gravity)0.85000 -
Bench height30.000 ft
Powder factor (explosive per bank volume)1.0000 lb/yd³
PatternRectangular, S = 1.5B

Applying the formula below gives:

ResultValue
Load factor (explosive per length of hole)13.187 lb/ft
Stemming13.500 ft
Subdrill4.5000 ft
Powder column21.000 ft
Explosive per hole276.92 lb
Rock broken per hole276.92 yd³
Burden12.890 ft
Spacing19.335 ft

Open this example in the calculator and change any input.

Formula

\(LF = 0.34\,SG_eD_e^2, \quad T = 24D_e, \quad J = \tfrac13T, \quad C = H + J - T\)

\(W_E = C\cdot LF, \quad V_r = \frac{W_E}{P_f}, \quad B = \sqrt{\frac{V_r}{kH}},\ S = kB\)

Variables

Symbol Meaning SI unit
\(D_e\) Blasthole diameter m
\(SG_e\) Explosive density (specific gravity) -
\(H\) Bench height m
\(P_f\) Powder factor (explosive per bank volume) kg/m³
\(\text{pattern}\) Pattern -
\(LF\) Load factor (explosive per length of hole) kg/m
\(T\) Stemming m
\(J\) Subdrill m
\(C\) Powder column m
\(W_E\) Explosive per hole kg
\(V_r\) Rock broken per hole m³
\(B\) Burden m
\(S\) Spacing m

Method and standards

Powder factor method.

Where it is used

  • First blast pattern for a new bench or rock type.
  • Checking what a change of hole size does to the pattern.

Common mistakes

  • Using the hole depth instead of the bench height for H.
  • Mixing powder factor per short ton with per cubic yard.

Assumptions and limits

  • Empirical; adjust burden for geology and confinement.

Questions and answers

Which powder factor should I choose?

Designers quote 0.25-0.40 lb/yd³ for easy breakage, 0.40-0.75 medium, 0.75-1.25 hard and 1.25-2.50 very hard rock; the seismic velocity of the rock is another guide.

Why is the load factor 0.34 SG D²?

It is the mass of explosive in one foot of a hole of D inches filled at specific gravity SG: π/4 × D² in² × 12 in × 0.0361 lb/in³ × SG.

What do the defaults represent?

A 6¾ in hole on a 30 ft bench loaded with ANFO (SG 0.85) for 1 lb/yd³: 13.2 lb/ft, 13.5 ft of stemming, 4.5 ft of subdrill and a 21 ft column, so 277 lb per hole breaking 277 yd³ on a 12.9 ft by 19.3 ft rectangular pattern.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Dougherty and Schissler (eds.), SME Mining Reference Handbook, 2nd ed. (SME, 2020), ch. 11, eqs. 11.1-11.10 (powder factor method)

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.