FireCADCalc

Blast Design by Energy Factor (Blast Dynamics Method)

Charge per hole, charge energy and the burden and spacing that deliver a target energy factor in kcal per short ton, with stemming and subdrill (Floyd).

Inputs

Examples: 6.5 in ANFO hole, 190 kcal/st, SG 2.65 rock, 30 ft9 in emulsion 1.2 g/cc, 750 cal/g, 250 kcal/st, 45 ft5 in ANFO, weak rock 100 kcal/st, SG 2.3, 25 ft

Accepted: 0.7874 to 19.685 in
Accepted: 0.5 to 1.7
Accepted: 238.85 to 1,910.8 kcal/kg
Accepted: 10.834 to 433.35 kcal/sh ton
Accepted: 62.428 to 312.14 lb/ft³
Accepted: 3.2808 to 196.85 ft

Results

Floyd's guide: aim for about 190 kcal/sh ton (100 very weak rock to 250 blocky hard rock), a hole diameter near L/10 and L/B between 2 and 3.5 or more.

Stemming9.1667ft
Subdrill2.9167ft
Charge per length of hole6.8098lb/ft
Charge per hole127.68lb
Charge energy per hole52,820kcal
Burden15.997ft
Spacing (1.15B)18.397ft
Relative weight strength (ANFO = 1)1.0000
Relative bulk strength (ANFO = 1)0.98728

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 6.5 in ANFO hole, 190 kcal/st, SG 2.65 rock, 30 ft. The inputs, in the units selected above:

InputValue
Explosive diameter6.5000 in
Explosive loading density (g/cc)0.85000 -
Absolute weight strength (ANFO 912 cal/g)912.00 kcal/kg
Desired energy factor190.00 kcal/sh ton
Rock density165.43 lb/ft³
Bench height30.000 ft

Applying the formula below gives:

ResultValue
Stemming11.917 ft
Subdrill3.7917 ft
Charge per length of hole12.228 lb/ft
Charge per hole267.49 lb
Charge energy per hole110,652 kcal
Burden14.286 ft
Spacing (1.15B)16.428 ft
Relative weight strength (ANFO = 1)1.0000
Relative bulk strength (ANFO = 1)1.0490

Open this example in the calculator and change any input.

Formula

\(T = 22D_e\ (\rho_e<0.9)\ \text{or}\ 24D_e, \quad J = 7D_e, \quad C_w = (L + J - T)\rho_e', \quad C_e = C_w\,AWS\)

\(B = \sqrt{\frac{C_e}{1.15\,CE_d\,\rho_rL}}, \quad S = 1.15B, \quad RWS = \frac{AWS}{912}, \quad RBS = \frac{AWS\,\rho_e}{739}\)

Variables

Symbol Meaning SI unit
\(D_e\) Explosive diameter m
\(\rho_e\) Explosive loading density (g/cc) -
\(AWS\) Absolute weight strength (ANFO 912 cal/g) J/kg
\(CE_d\) Desired energy factor J/kg
\(\rho_r\) Rock density kg/m³
\(L\) Bench height m
\(T\) Stemming m
\(J\) Subdrill m
\(\rho_e'\) Charge per length of hole kg/m
\(C_w\) Charge per hole kg
\(C_e\) Charge energy per hole J
\(B\) Burden m
\(S\) Spacing (1.15B) m
\(RWS\) Relative weight strength (ANFO = 1) -
\(RBS\) Relative bulk strength (ANFO = 1) -

Method and standards

Floyd's Blast Dynamics energy-factor method.

Where it is used

  • Mine-to-mill blasting where fragmentation targets drive energy.
  • Switching explosive products at constant energy.

Common mistakes

  • Entering the energy factor per tonne when the method uses short tons.
  • Using bulk strength values for weight strength.

Assumptions and limits

  • Empirical guide values; adjust in the field.

Questions and answers

Why design on energy rather than mass?

Explosives differ in energy per kilogram; an energy factor lets an emulsion and ANFO be compared on the same footing.

What do the defaults represent?

A 6½ in hole loaded with ANFO (0.85 g/cc, 912 cal/g) on a 30 ft bench in rock of SG 2.65 for 190 kcal/sh ton: stemming 11.9 ft, subdrill 3.8 ft, 267 lb and 110,700 kcal per hole, burden 14.3 ft and spacing 16.4 ft.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Dougherty and Schissler (eds.), SME Mining Reference Handbook, 2nd ed. (SME, 2020), ch. 11, eqs. 11.27-11.39 (Floyd, Blast Dynamics method)

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.