Blast Burden by Ash's Burden Ratio

Burden ratio Kb adjusted for rock and explosive density and detonation velocity, then burden, stemming, subdrill and spacing (Ash 1963).

Inputs

Examples: 6 in ANFO hole, 165 lb/ft3 rock, 30 ft benchAsh's reference: SG 1.3, 12,000 ft/s, 160 lb/ft310 in emulsion, 175 lb/ft3, 50 ft bench

Accepted: 0.7874 to 19.685 in
Accepted: 62.428 to 312.14 lb/ft³
Accepted: 0.5 to 1.7
Accepted: 4,921.3 to 26,247 ft/s
Accepted: 3.2808 to 196.85 ft

Results

Ash's base ratio is 30 for an average explosive (SG 1.3, 12,000 ft/s) in average rock (160 lb/ft³); his table gives 20-40 for other combinations.

Burden ratio25.821
Burden12.910ft
Stemming9.0373ft
Subdrill3.8731ft
Spacing, instantaneous holes25.821ft
Spacing, individually delayed holes12.910ft
Hole depth over burden (keep 1.5-4)2.6237

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 6 in ANFO hole, 165 lb/ft3 rock, 30 ft bench. The inputs, in the units selected above:

InputValue
Explosive (hole) diameter6.0000 in
Rock density165.00 lb/ft³
Explosive density (specific gravity)0.85000 -
Velocity of detonation12,000 ft/s
Bench height30.000 ft

Applying the formula below gives:

ResultValue
Burden ratio25.821
Burden12.910 ft
Stemming9.0373 ft
Subdrill3.8731 ft
Spacing, instantaneous holes25.821 ft
Spacing, individually delayed holes12.910 ft
Hole depth over burden (keep 1.5-4)2.6237

Open this example in the calculator and change any input.

Formula

\(K_b = 30\left(\frac{160}{G_r}\right)^{0.33}\left(\frac{SG_e\,VOD^2}{187\times10^6}\right)^{0.33}, \quad B = K_b\frac{D_e}{12}\)

\(T = 0.7B, \quad J = 0.3B, \quad 1.5B < L + J < 4B\)

Variables

Symbol Meaning SI unit
\(D_e\) Explosive (hole) diameter m
\(G_r\) Rock density kg/m³
\(SG_e\) Explosive density (specific gravity) -
\(VOD\) Velocity of detonation m/s
\(L\) Bench height m
\(K_b\) Burden ratio -
\(B\) Burden m
\(T\) Stemming m
\(J\) Subdrill m
\(S_i\) Spacing, instantaneous holes m
\(S_d\) Spacing, individually delayed holes m
\((L+J)/B\) Hole depth over burden (keep 1.5-4) -

Method and standards

Ash's burden ratio method.

Where it is used

  • Burden for a chosen hole size and explosive.
  • Comparing explosives on the same bench.

Common mistakes

  • Ignoring the 1.5B-4B restriction.

Assumptions and limits

  • Empirical; first approximation.

Questions and answers

How does the burden ratio change?

It rises with a denser or faster explosive and falls in denser rock, as the cube-root terms show.

Why is the spacing 2B for instantaneous holes?

Holes fired together interact and break a wider strip; delayed holes each need their own free face, so spacing equals burden.

What do the defaults represent?

A 6 in hole with ANFO (SG 0.85, 12,000 ft/s) in 165 lb/ft³ rock on a 30 ft bench: Kb = 25.8, burden 12.9 ft, stemming 9.0 ft and subdrill 3.9 ft.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Dougherty and Schissler (eds.), SME Mining Reference Handbook, 2nd ed. (SME, 2020), ch. 11, eqs. 11.11-11.17 and Table 11.2 (Ash 1963)

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.