Worked example
Example: 6 in ANFO hole, 165 lb/ft3 rock, 30 ft bench. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Explosive (hole) diameter | 6.0000 in |
| Rock density | 165.00 lb/ft³ |
| Explosive density (specific gravity) | 0.85000 - |
| Velocity of detonation | 12,000 ft/s |
| Bench height | 30.000 ft |
Applying the formula below gives:
| Result | Value |
|---|---|
| Burden ratio | 25.821 |
| Burden | 12.910 ft |
| Stemming | 9.0373 ft |
| Subdrill | 3.8731 ft |
| Spacing, instantaneous holes | 25.821 ft |
| Spacing, individually delayed holes | 12.910 ft |
| Hole depth over burden (keep 1.5-4) | 2.6237 |
Open this example in the calculator and change any input.
Formula
\(K_b = 30\left(\frac{160}{G_r}\right)^{0.33}\left(\frac{SG_e\,VOD^2}{187\times10^6}\right)^{0.33}, \quad B = K_b\frac{D_e}{12}\)
\(T = 0.7B, \quad J = 0.3B, \quad 1.5B < L + J < 4B\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(D_e\) | Explosive (hole) diameter | m |
| \(G_r\) | Rock density | kg/m³ |
| \(SG_e\) | Explosive density (specific gravity) | - |
| \(VOD\) | Velocity of detonation | m/s |
| \(L\) | Bench height | m |
| \(K_b\) | Burden ratio | - |
| \(B\) | Burden | m |
| \(T\) | Stemming | m |
| \(J\) | Subdrill | m |
| \(S_i\) | Spacing, instantaneous holes | m |
| \(S_d\) | Spacing, individually delayed holes | m |
| \((L+J)/B\) | Hole depth over burden (keep 1.5-4) | - |
Method and standards
Ash's burden ratio method.
Where it is used
- Burden for a chosen hole size and explosive.
- Comparing explosives on the same bench.
Common mistakes
- Ignoring the 1.5B-4B restriction.
Assumptions and limits
- Empirical; first approximation.
Questions and answers
How does the burden ratio change?
It rises with a denser or faster explosive and falls in denser rock, as the cube-root terms show.
Why is the spacing 2B for instantaneous holes?
Holes fired together interact and break a wider strip; delayed holes each need their own free face, so spacing equals burden.
What do the defaults represent?
A 6 in hole with ANFO (SG 0.85, 12,000 ft/s) in 165 lb/ft³ rock on a 30 ft bench: Kb = 25.8, burden 12.9 ft, stemming 9.0 ft and subdrill 3.9 ft.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Dougherty and Schissler (eds.), SME Mining Reference Handbook, 2nd ed. (SME, 2020), ch. 11, eqs. 11.11-11.17 and Table 11.2 (Ash 1963)