Slip Casting: Wall Thickness and Casting Time

Casting rate constant from a test and the time to build a wanted wall thickness in a plaster mould, by the parabolic (filtration) casting law.

Inputs

Examples: Illustrative 6 mm testFast casting slipPressure casting

Accepted: 0.1 to 50 mm
Accepted: 0.016667 to 1,666.7 min
Accepted: 0.1 to 50 mm
Accepted: 0.016667 to 1,666.7 min

Results

The plaster draws water through the growing cast layer, whose resistance grows with its thickness, so the thickness grows with the square root of time: L² = K t. One test fixes K (reported here in mm² per minute); doubling the wall takes four times as long. K depends on slip solids, deflocculation, temperature and mould dryness, so test with production slip and moulds.

Casting rate constant L²/t1.2000
Time for the wanted thickness53.333min
Thickness after the prediction time8.4853mm

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Illustrative 6 mm test. The inputs, in the units selected above:

InputValue
Wall thickness in the test6.0000 mm
Casting time in the test30.000 min
Wall thickness wanted8.0000 mm
Time for which to predict thickness60.000 min

Applying the formula below gives:

ResultValue
Casting rate constant L²/t1.2000
Time for the wanted thickness53.333 min
Thickness after the prediction time8.4853 mm

Open this example in the calculator and change any input.

Formula

\(L^2 = K t, \quad t_2 = t_1\left(\frac{L_2}{L_1}\right)^2\)

Variables

Symbol Meaning SI unit
\(L_1\) Wall thickness in the test m
\(t_1\) Casting time in the test s
\(L_2\) Wall thickness wanted m
\(t\) Time for which to predict thickness s
\(K\) Casting rate constant L²/t -
\(t_2\) Time for the wanted thickness s
\(L(t)\) Thickness after the prediction time m

Method and standards

Slip casting.

Where it is used

  • Sanitaryware, tableware and technical ceramics.
  • Pressure casting set-up.

Common mistakes

  • Using a linear rate.
  • Testing with a wet or different mould.

Assumptions and limits

  • Constant slip and mould conditions.

References

  • Parabolic filtration law of slip casting

Questions and answers

How long for an 8 mm wall if 6 mm takes 30 min?

30 × (8/6)² = 53 min.

Why does casting slow down?

The cast layer itself resists the flow of water into the mould, more as it thickens.

What do the defaults represent?

A test casting of 6 mm in 30 min, predicted for 8 mm and for 60 min.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Reed, Principles of Ceramics Processing, 2nd ed. (Wiley, 1995)

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.