FireCADCalc

Glass Batch CO₂ and Cullet Energy Saving

Process CO₂ released from carbonate raw materials per tonne of glass, and the melting energy and CO₂ saved by a share of cullet.

Inputs

Examples: Illustrative container glass, 30 % culletFloat glass, 15 % culletHigh cullet, 80 %

Accepted: 0 to 30 %
Accepted: 0 to 30 %
Accepted: 0 to 20 %
Accepted: 0 to 100 %
Accepted: 2 to 20 MJ/kg
Accepted: 0 to 50 %
Accepted: 0 to 100 kg/GJ

Results

Soda ash, limestone and dolomite release CO₂ as they melt: each kg of Na₂O, CaO or MgO in the glass came with 44/62, 44/56 or 44/40 kg of CO₂. Cullet (recycled glass) has already lost its CO₂ and needs less energy to melt, about 2.5–3 % less per 10 % of cullet. Both savings scale with the cullet share. CO₂ is shown in kg per tonne of glass and energy in MJ/kg (equal to GJ per tonne); fuel CO₂ uses the emission factor of the furnace fuel (56 kg/GJ for natural gas).

Process CO₂ per kg of glass 40.095kg/t
Melting energy with the cullet3.8800MJ/kg
Energy saved22.400%
Total CO₂ per kg of glass, process plus fuel257.76kg/t
Total CO₂ per kg of glass with no cullet480.97kg/t

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Illustrative container glass, 30 % cullet. The inputs, in the units selected above:

InputValue
Na₂O in the glass (from soda ash)13.000 %
CaO in the glass (from limestone)10.000 %
MgO in the glass (from dolomite or magnesite)3.0000 %
Cullet share of the batch30.000 %
Melting energy with no cullet (per kg of glass)5.5000 MJ/kg
Energy saved per unit cullet share (0.25 means 2.5 % per 10 %)25.000 %
Fuel CO₂ per GJ of melting energy56.100 kg/GJ

Applying the formula below gives:

ResultValue
Process CO₂ per kg of glass 142.48 kg/t
Melting energy with the cullet5.0875 MJ/kg
Energy saved7.5000 %
Total CO₂ per kg of glass, process plus fuel427.89 kg/t
Total CO₂ per kg of glass with no cullet512.10 kg/t

Open this example in the calculator and change any input.

Formula

\(CO_{2,proc} = (1 - f_c)\left(x_{Na_2O}\frac{44}{62} + x_{CaO}\frac{44}{56} + x_{MgO}\frac{44}{40}\right), \quad E = E_0(1 - k f_c)\)

Variables

Symbol Meaning SI unit
\(x_{Na_2O}\) Na₂O in the glass (from soda ash) -
\(x_{CaO}\) CaO in the glass (from limestone) -
\(x_{MgO}\) MgO in the glass (from dolomite or magnesite) -
\(f_c\) Cullet share of the batch -
\(E_0\) Melting energy with no cullet (per kg of glass) J/kg
\(k\) Energy saved per unit cullet share (0.25 means 2.5 % per 10 %) -
\(e_f\) Fuel CO₂ per GJ of melting energy kg/J
\(CO_{2,proc}\) Process CO₂ per kg of glass kg/kg
\(E\) Melting energy with the cullet J/kg
\(\Delta E\) Energy saved -
\(CO_{2,tot}\) Total CO₂ per kg of glass, process plus fuel kg/kg
\(CO_{2,0}\) Total CO₂ per kg of glass with no cullet kg/kg

Method and standards

Glass batch CO₂.

Where it is used

  • Glass furnace emissions reporting.
  • Business case for cullet recycling.

Common mistakes

  • Counting CO₂ from cullet.
  • Applying the energy rule beyond about 90 % cullet.

Assumptions and limits

  • All alkali and alkaline-earth oxides from carbonates; linear cullet effect.

References

  • Carbonate decomposition stoichiometry and cullet energy rule

Questions and answers

How much process CO₂ does soda-lime glass release?

About 200 kg per tonne with no cullet for the default composition, from soda ash, limestone and dolomite.

How much does cullet save?

About 2.5–3 % of melting energy per 10 % of cullet, and the process CO₂ in proportion.

What do the defaults represent?

A container glass with 13 % Na₂O, 10 % CaO and 3 % MgO, 30 % cullet, 5.5 GJ/t melting energy on natural gas.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Mullinger and Jenkins, Industrial and Process Furnaces, 2nd ed. (Butterworth-Heinemann, 2014)

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.