FireCADCalc

Battery Capacity for a DC Load Duty Cycle

Battery ampere-hour capacity for a DC duty cycle of up to three load periods, with temperature, ageing and design factors and depth of discharge.

Thermal power plantProcess steam and utilitiesSugar mill and cogenerationChemical and fertiliserPulp and paperFood, dairy and textile

Inputs

Examples: Switchgear: 60 A 1 min, 20 A 2 h, 100 A 1 minTelecom 30 A for 8 h

Results

Ampere-hour method; it does not capture the extra capacity needed for short high-current periods (the IEEE 485 section method does, using the maker's discharge curves). Check the battery can deliver the highest current to the end voltage.

Load ampere-hours240.00Ah
Rated capacity, ampere-hour estimate (check by IEEE 485 for short high currents)412.50Ah
Highest load current30.000A

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Switchgear: 60 A 1 min, 20 A 2 h, 100 A 1 min. The inputs, in the units selected above:

InputValue
Load current, period 160.000 A
Duration of period 11.0000 min
Load current, period 220.000 A
Duration of period 2120.00 min
Load current, period 3100.00 A
Duration of period 31.0000 min
Temperature correction factor (rated capacity at 25 °C; 1 at or above 25 °C)1.1100 -
Ageing factor1.2500 -
Design margin1.1000 -
Usable depth of discharge80.000 %

Applying the formula below gives:

ResultValue
Load ampere-hours42.667 Ah
Rated capacity, ampere-hour estimate (check by IEEE 485 for short high currents)81.400 Ah
Highest load current100.00 A

Open this example in the calculator and change any input.

Formula

\(Ah = \sum I_it_i, \quad C = \frac{Ah\cdot k_Tk_Ak_D}{DoD}\)

Variables

Symbol Meaning SI unit
\(I_1\) Load current, period 1 A
\(t_1\) Duration of period 1 s
\(I_2\) Load current, period 2 A
\(t_2\) Duration of period 2 s
\(I_3\) Load current, period 3 A
\(t_3\) Duration of period 3 s
\(k_T\) Temperature correction factor (rated capacity at 25 °C) -
\(k_A\) Ageing factor -
\(k_D\) Design margin -
\(DoD\) Usable depth of discharge -
\(Ah_{load}\) Load ampere-hours (charge) C (shown in Ah)
\(C\) Rated capacity, ampere-hour estimate C (shown in Ah)
\(I_{max}\) Highest load current A

Method and standards

Ampere-hour method.

Where it is used

  • Substation and power plant DC systems.
  • Emergency lighting batteries.

Common mistakes

  • Forgetting the end-of-life margin.
  • Sizing on ampere-hours only for high short currents.

Assumptions and limits

  • Ampere-hour basis: the result is a first estimate. Short high-current periods (breaker trip and close, motor starts) need more capacity than their ampere-hours suggest; confirm the size by the IEEE 485 section method with the maker's discharge curves.
  • Rated capacity referred to 25 °C; the temperature factor is 1 or more (a warmer room is not credited).

References

  • Ampere-hour sizing with temperature
  • ageing and design margins (IEEE 485 factors; definitions)

Questions and answers

Why an ageing factor of 1.25?

Batteries are replaced at 80 % of rated capacity; sizing 25 % up keeps the duty met to end of life.

Why a temperature factor?

Lead-acid capacity falls in the cold: about 11 % more is needed at 15 °C than at 25 °C.

What do the defaults represent?

A switchgear battery: 60 A tripping for one minute, 20 A standing load for two hours, then 100 A closing for one minute.

Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.